Laserfiche WebLink
• Colorado Division of Minerals and Geolo~ <br />_________________________________________ <br />ESTIMATING FORM - BULLDOZER WORK <br />Task q: 1 Prep. by: TAS Task Pile Name: M626-1 <br />____________ _________ __________ <br />Dale: 08/19/98 Permit k:M-"/'/-526 Mine: Worthing Lakes Pit <br />____________ _________ ____________________ <br />Permit Action: Final Reclamation <br />Task Description: Reg ra de the north shore from 0.25/1 to 3:1 slope <br />________________________________________________ <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DRN <br />Blade Type: UNIVERSAL <br />Attachment N1: ROPS Cab <br />Attachment p2: N/A <br />Horsepower: 285 <br />Shift Basis: 1/day <br />Cos[ Breakdown: <br />""'-----'"""" Utilization } <br />Ownership cost/hr = $37.34 N(A <br />Operating 6 overhaul cost/hr- dozer = $55.31 100 <br /> -ripper = $0.00 N/A <br />Operator cost/hr = 523.12 N/A <br />Total egpt. unit cost/hr = $115.76 Tota]P fleet cost /hr : 5115."16 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 2,000.0 BCY <br />____________ Factor: 1.230 Volume: <br />__________ _____ 2,96 <br />____ 0.0 <br />___ LCY <br />_ <br />Source of quancity take-off: permit <br />Source of est. swell factor: program <br />________ <br />__________________________ <br />____ <br />___ <br />__________ <br />HOURLY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg. push distance: loo ft. ""'----""'""'-"'"'" "'- --' <br />"""""--' Operator.......... 0 .76 (avg.) <br />Una djus[ed hourly Mat. consistency.. 0 .90 (Cat tbl) <br />dozer production: 969 LCY/hr Dozing method..... 1 .20 (slot) <br />'---""'" Visibility........ 1 .00 (avg.l <br />Material consistency: Job efficiency.... 0 .83 (lsh/day) <br />Compactetl fill or embankment Spoil pile factor. 0 .90 (ssd-fc) <br />_____________________________ ________ Push 9radient..... : 1 .05 (Cat tbl) <br />Avg. push gradient: 2.00 } (neg) Altitude dera[ion. 1 .00 ICa[ tbll <br />----""' Material weight... 1 .10 ICat [bll <br />Avg. site altitude: 6000 <br />_________ ft. Blade type........ <br />_________________________ 1 <br />____ .00 <br />___ (5 or UI <br />Male rral weight 2100.00 16/LCY Net Job Correction 0 .69 <br />Mat. Descr.: _________ ____ ____ ___ <br />Earth - Loam <br />_____________________________ <br />________ Adjusted Unit Prod.: <br />____ 668 <br />____ .03 <br />___ LCY/hz <br /> Adjus ted Fleet Production: 668 .03 LCY/hr <br />JOB COST ---' °"" "' <br />Fleet size 1 <br />________ Dozer (s) Total Job Time: <br />____ 3 <br />____ .68 <br />___ Hours <br />Unit Cost $0.173 <br />________ /LCY Total Job Cost: <br />____ $426 <br />____ .29 <br />___ <br />