Laserfiche WebLink
iii iiuiiiiiiiiiiii <br />Western Corporate -Centre/ Services <br />1590 W. 12th Ave. <br />Mobile Denver, Colorado 80284 <br />303.657.4334 <br />Aggregate • Asphalt • Corcrete ~ Fax 3Q3.651. 4339 <br />,~cr`FIVEG <br />July 15, 1996 JUI.. 16 1996 <br />Division of Minerals b Gcoiog; <br />Mr. Tony Waldron <br />Division ofMinerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver- Colorado 80203 <br />RE: Corrective Actions from Inspection for Bunn Ranch Pit, M-80-131 <br />Dear Mr. Waldron: <br />Your inspection report, dated 6/12196, listed two areas needing corrective actions. The following <br />is a summary of our compliance: <br />/) Control of noxious weedy on sire. <br />Except for the whitetop, spraying for all of the noxious weeds will be completed by <br />September 1, 1996 by Mountain Air Spray Co. Whitetop will not be sprayed until Spring <br />of 1997. Please see the attached work order. <br />2) Berms arourul auxiliary diesel larks <br />The diesel tanks have been removed from the area. If they are used in the future with the <br />water pump, they will be bermed. <br />Should you have any additional questions, please contact me at (303) 657-4331. <br />Sincerely, <br />~j~ls't4`u~~-~ <br />Julie Goettemoeller <br />Land Manager <br />cc: K.R. Weatherly, Mountain Area Manager <br />A Redland Group company <br />