Laserfiche WebLink
•' • • <br />N. Status of 2roblem Resolution <br />the following items concern problems identified at previous inspection. Problems are classified <br />into three categories. These are: (1) problems resolved; (2) resolution still in process; and <br />(3) operator delinquent. The date that the problem is resolved or the date that the operator <br />is deemed delinquent is to be clearly stated. <br />1. Remove large rocks that block the diversion ditch below the mine bench - Resolution <br />Still in Progress. <br />2. Submit plans to stabilize the outslope of the mine bench - Resolution Still in <br />Progress. <br />3. Completion of sediment pond M3 - Resolution Still in Progress. <br />