My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC02178
DRMS
>
Back File Migration
>
Inspection
>
INSPEC02178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:15 PM
Creation date
11/18/2007 8:04:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Inspection
Doc Date
11/29/2002
Doc Name
Response to Identified Issues
From
Homestake
To
DMG
Inspection Date
10/30/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 2) <br />MINE ID # OR PROSPECTING ID #: M-1977-7t5 <br />' INSPECTION DATE: ~n-29-m INSPECTOR=S ~~ <br />INITIALS: <br />Please respond to this inspection report via Bob Oswald, Durango Field Office. <br />Inspector met operator representatives, Allen Cox and Vern Kelso, by accident in South Fork on October 25 and was <br />informed that construction on Amendments 11 and 12 was nearly complete, although Division was unaware of the <br />construction activities. Inspector told operator they might expect an inspection the following week. <br />Observed pipeline rip-rap covering in progress in lower W indy Gulch (below 9360 level), nearly completed topsoil covering <br />of 9360 bench, nearly completed pipeline and rip-rap covering construction in upper Windy Gulch (below 9700 level), and <br />nearly completed topsoil covering in lower tailings pond. <br />9360 bench covering drains generally toward the gulch and northward, which is obverse to direction of Windy Gulch flow. <br />The bench area appears to have a depression on the upper end of the drainage area which, it present, would pond water <br />causing recharge of surface water through part of the reclaimed tailings. All areas are topsoiled except area beneath the <br />stored rip-rap on upstream edge of bench. Otherwise, topsoiling appears adequate. <br />Rip-rap covering over pipeline in Tower W indy Gulch looks adequate. <br />Parts of geomembrane above pipeline in upper W indy Gulch (97001evel) were still exposed at time of inspection; <br />construction crew indicated this would probably be covered with rip-rap before end of week. Private access road to this <br />area is posted, but otherwise open. Two single lane roads occur on the eastern side of the reclaimed dump, and would be <br />accessible to traffic by crossing reclaimed gulch. Whether such traffic would be precluded by items of remaining <br />reclamation, and whether such traffic might damage the geomembrane are open to question. <br />The lower tailings pond was apparently completely topsoiled. An 8-12 foot deep depression behind the dam will cause <br />surface water to impound in the tailings, discharging through the permanent discharge ditch only aster heaviest <br />precipitation or snowmelt. At issue is whether this pond was to be afree-draining surface or not. <br />Gam. ~ 7001 2510 0004 2783 1540 <br />18 E ContactAddress <br />NAME: Alan Cox <br />OPERATOR: Barrick <br />STREET: _ 6719-D Academy Rd NE <br />CITY/STATE2IP: Albupuerq~, NM 87109 <br />Harry Posey <br />cc: r CE <br />r 8L <br />FS <br />r HW <br />- -- r°HNIWMD (CH) <br />r SE <br />r WOCD (CH) <br />r OTHER <br />Bob Oswald <br />Steve Shuey <br />
The URL can be used to link to this page
Your browser does not support the video tag.