(4) The impoundment was covered by snow, thus an estimate of remaining capacity could not be <br />determined. <br />(5) The pond was being cleaned of coal fines. Cleaning appeared to be approximately'/< <br />complete. See SUPPORT FACILITIES below. <br />(6) Some cleaning of the ponds was evident. Effectiveness and amount was not estimated due to <br />snow cover. See SUPPORT FACILITES below. <br />(7) 100-year precipitation event containment pond. There was no construction dewatering <br />dischazge to the 6-North Mains sedimentation pond, and no pumping under the construction <br />dewatering permit. <br />The following sites where sediment control measures other than sedimentation ponds aze used <br />were inspected. <br />Descri lion Condition <br /> <br />Rockdust Tank The site was accessible and in use, but sediment control measures <br /> were covered with snow. <br />Fish Creek Dewatering Site The site was accessible but not use. The site was covered with <br /> snow. <br />Site of former CYCC Office The site was accessible and in use as a hardstand area, but <br />Buildin sediment control measures were covered with snow. <br />Sandstones Power The site was accessible and in use, but sediment control measures <br />Substation were covered with snow. <br />Railroad Spur Extension The site was accessible and in use, but sediment control measures <br />Area were covered with snow. <br />Stoker Coal Loadout The site was accessible and in use, but sediment control measures <br /> were covered with snow. <br />Overland Belt West The site was accessible and in use, but sediment control measures <br /> were covered with snow. <br />Storage and Training Area The site was accessible and in use, but sediment control measures <br /> were covered with snow. <br />7 North Escape Shafr This site was not inspected. The road to it had not been cleared of <br /> snow. <br />EMD Ventilation Shaft The site was accessible and in use, but sediment control measures <br /> were covered with snow. <br />EMD Dewatering Authorized but not constructed. <br />Treatment Facili <br />Rockfall Hazazd Trenches The site was observed from Routt County Road 27, but sediment <br /> control measures were covered with snow. <br />NMD Power Borehole and The site was accessible and in use, but sediment control measures <br />Substation were covered with snow. <br />NW Mains Ventilation The site was accessible and in use, but sediment control measures <br />Shaft were covered with snow. <br />18-Right Ventilation Shafr The site was accessible and in use, but sediment control measures <br /> were covered with snow. <br />C-1982-056. CC Inspection of 17 January 2007, Page 5 of 14 pages. BGW <br />