Laserfiche WebLink
<br />MINE ID # OR ]?ROSPECTING ID: M-1990-144 <br />INSPECTION DACE: 2/10/2000 <br />INSPECTOR'S INITIALS: JCS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, ~r they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Bard. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1) The approvf~d mining plan for the operation indicates that 5/1/00 <br />no mining wi1:L be conducted below groundwater elevation and <br />materials wi1:L not be removed within at least two feet above <br />groundwater elevation. The continued visible ponding of water <br />in two excavated areas within the permit area, however, <br />indicates that groundwater may still be exposed by the mining <br />operation. <br />The permittee must provide evidence that the remaining areas PB OR PV: PB <br />of ponded watf~r do not represent groundwater exposed by <br />the mining operations at the site or comply with the conditions <br />of the permit and backfill the areas of exposed groundwater to <br />a point two feet above the level of the groundwater or submit TOPICS: MP, HB <br />a modif icatioii of the permit that allows the exposure of ground- <br />water by and during the mining operation and, if desired, allows <br />permanent ponds to be established in conjunction with final <br />reclamation oi: the site. <br />2~ Although tkie Division has not completed its re-evaluation CORRECTION <br />of the suffic:.ency of the financial warranty, it has reason DATE <br />to believe then reclamation of mining related disturbance <br />at the site could not be completed with the funds currently 60 days after notice <br />available. any insufficiency <br />The Division will estimate the current cost of reclaiming the PB OR PV: PB <br />site. If the Division's estimate indicates that the currently <br />posted financial warranty is insufficient to complete the TOPIC: FN <br />approved reclamation plan, the operator will be so notified, <br />provided with a copy of the Division's estimate and allowed 60 <br />days to bring the site into compliance pursuant to the <br />requirements of C.R.S. 34-32.5-117 (4). <br />(Page ~) <br />