My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC01965
DRMS
>
Back File Migration
>
Inspection
>
INSPEC01965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:09 PM
Creation date
11/18/2007 8:03:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
9/3/2002
Doc Name
OSM Mine Inspection Report
From
OSM
To
DMG
Inspection Date
8/13/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />~ECEIV~FICE OF SURFACE l~'~~~~p <br />AUG 3 0 2002 Mine Site Evaluation <br />....E a:mmle nnA renlnnv State- Program SEA' 0 32002 <br />1. Permittee/Person 9. Permit Number , , <br />~ Geology Permit Type <br />NATIONAL KING COAL C-035-81 ~ PP <br />2. Address I I. Field Visit Date 12. Purpose 13. SRA Present <br />4424 COUNTY Rb. 120 08!13!2002 ~ ^Y <br />3. City 4. State ~ ⢠as - yyyy <br /> 14. Permit Status 15. Site Status 16. Facility Type <br />Hes etas CO ~ ~ ~~ <br />5. Zip Code 6. Phone Number <br />17. OSM Office # <br />18. CCID # °~-J <br />19. Land Code <br />81326 (970) 385-4606 <br />~ <br /> 140 SI <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> A <br /> OS-00299 CO L <br />PLATA <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />KING COAL MINE <br /> ~~ <br />25. Hours 26. i afore Block 27. Reviewing Offici0l: <br />2.0 a. Permit Review ~ ~,~ <br />~ ~ <br />~ <br />d <br />~' <br />l <br /> ~ <br />y <br />1 <br />/ <br />~ <br />3 <br />0 b. Site Visit Time S afore: n~r <br />(i! ~ Signature: <br />. HENRY AUSTIN ID # 116 <br />'t <br /> Review Date: (i <br />d l2~/0'= <br />10.0 c. Travel Time Printed Name: <br /> mm - dd - yyyy <br />1.0 d. Report Writing Date: 08/27/2002 Ts Supplemental MSE Page Used Y/N Y~ <br />Permit Type -Item 10 IP =Interim Prog2m, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />Oxx.ā.Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />A>at.... Assistance Fxx..... Fede21 Actions CCF.... Cozen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time tluring the review of the mine site. <br />Permit Status -Item 14 AB.... Abandonetl: All surface and underground coat mining activities have ceased and <br /> operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppermitted but not yet disturbed. AB1., good Fortekure: Bond forfeiture officially in prooess or completed, and. <br />IN....Inactive (Permanent Program PermR): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) A62..Partially Reclaimed Forfeiture; Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated, used to reclaim sHe, but site not reclaimed to Program standards. <br />R... Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA....Not Applicable: When site is unpermitted. <br />ite Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Ceal Exploration: Coal exploration operations <br />o <br />erations <br />v <br />t <br />d <br />nd wh <br />r <br />c <br />l <br />i <br />h <br />t TC..Temporary Cessation: The RA has granted <br />cessation of mi <br />in <br />ursu <br />30 CFR 876/ <br />nt t pperformance bond(s), and/or reclama- <br />o <br />f f <br />f <br />it <br />d <br />it <br />i <br />p <br />e <br />e <br />e <br />oa <br />min <br />ng <br />a <br />e s <br />ar <br />a g p <br />n <br />a <br />o on o <br />or <br />e <br />e <br />s <br />e <br />s in progress. <br />have not begun. <br />i <br />i <br />l <br />d <br />i <br />C <br />l <br />f <br />P <br />A <br />ti <br />C 817.131(b). <br />Ph <br />At l <br />1 b <br />Pi <br />I RR <br />l <br />t Ph <br />d <br />l FR.. Forfeited and Reclaimed: Forfeiture <br />n <br />Pro <br />uc <br />oa <br />sur <br />ace m <br />ng <br />.. <br />c <br />ve <br />oa <br />ng: ... <br />ase <br />e <br />ease: <br />eas <br />ase <br />on <br />re <br />ease reclamation completed, <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />Nā Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. <br />ti <br />i <br />t <br />i <br />it P2.. Phase II Release: At least Phase II bond release <br />f <br />th <br />ti <br />itt WC.Wildcat: Coal mining and reclamation <br />ve, s <br />s <br />atus <br />s ac <br />e <br />M..No Mining: The Permit S <br />- or <br />e en <br />re perm <br />ed area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />citify Type Codes- Item 18 D...Ancillary (Haulroad, Conveyor, andlor Rails) H... Exploration Permits L... Remining stte ppermitted <br />... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 antl 2/3 <br />... Preparation Plant G... Stockpiles K._Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />e Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boazds were established to receive comments from <br />mail businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a ene 's <br />esponsiveness to small business. Tf you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />d wish to comment on the enforcement or compliance acfivities of OSM, call 1-888-REG-FAIR (1-888-734-3247). ~ x~~a n~av,ea a, i9ve <br />.:., <br />
The URL can be used to link to this page
Your browser does not support the video tag.