Laserfiche WebLink
of ~~_ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~% <br />„~' ~ MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866-3567 <br />~ t8]6 ~` <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below, This report <br />documents observations concerning compliance of the mining operation with the permit and the regulations of the <br />Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested <br />corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the Mined Land <br />Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE <br />CORRECTIVE ACTION AND/OR RESPONSES TO THE DIVISION IN ORDER TO AVOID CONSIDERATION <br />OF POSSIBLE ENFORCEMENT ACTION BY THE MINED LAND RECLAMATION BOARD. <br />MINE NAME: Bettaer Gravel Pit OPERATOR: Duckels Construction, Inc. <br />COUNTY: Routt MIN L: vel TYPE OF OPERATION: 112 <br />INSPECTOR(S): Erica Crosbv <br />MINE ID # OR PROSPECTIN -1976-051 <br />INSPECTION DATE: 07/29/03 DATE OF COMPLAINT: NA <br />INSPECTOR'S INITIALS: ESC TIME OF DAY (MILITARY): 10:00 <br />INSPECTION TYPE CODEiIi: MI POST INSP. CONTACTStzI: NO <br />JOINT INSP. AGENCY CODEIZI: NO REASON FOR INSP. CODEI'I: <br />WEATHER CODEi4l: CR BOND CALCULATION TYPED: BC <br />OP. REP. PRESENT: Rick Bouchard; Duckels Construction. Inc. <br />1. INSPECTION TYPE CODE - (CL-IN: IL=Illegal Operation, MI=Monitoring, MP=Mineral Prospect, S1=Surety-related, PR=PreoperationJ <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE - JCL-AG: NO=None, BL=BLM, CH=Colo. Dept. Health; CL=Land Board, <br />CT=Citizen; CW=Wildlife, FS=Forest Service, HW=Hwy. Dept., LC=Local Government, SE=State Engr.l <br />3. REASON FOR INSPECTION CODE - JCL-RS: AC=Other Agency Request, CT=Citizen Complaint, IE=Normal I&E Program, HP=High Priority, PY=Priorityl <br />4. WEATHER CODE-[CL-W E: CL=Cloudy,CR=CIeaq IN=Inclement-prevented inspection,RN=Raining, SN=Snowing, WD=Windy <br />5. BOND CALCULATION TYPE: - ABC=Complete Bond, BP=Partial Bond, NN=None) <br />This list identities the environmental and permit parameters inspected and gives a categorical evaluation of each. IF PB <br />OR PV IS INDICATED, YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE <br />COMPLIANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND REGULATIONS. If PV <br />is indicated, you will be notified under separate cover when the Mined Land reclamation Board will consider possible <br />enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS ............................................. Y (FN) FINANCIAL WARRANTY...... Y (RD) ROADS......................... Y <br />(HB) HYDROLOGIC BALANCE ................ Y (BG) BACKFILL & GRADING......... Y (EX) EXPLOSIVES............. NA <br />(PW) PROCESSING WASTE/TAILING..... NA (SF) PROCESSING FACILITIES.... Y (TS) TOPSOIL ..................... Y <br />(MP) GENL MINE PLAN COMPLIANCE. Y (FW) FISH & WILDLIFE ................... Y (RV) REVEGETATION..... PB <br />(SM) SIGNS AND MARKERS ...................... PB (SP) STORM WATER MGT PLAN.. Y (SB) COMPLETE INSP...... Y <br />(ES) OVERBURDEN/DEV. WASTE............ NA (SC) EROSIONlSEDIMENTATION Y (RS) RECL PLAN/COMP.. PB <br />(AT) ACID OR TOXIC MATERIALS......... NA (OD) OFF-SITE DAMAGE .............. NA (ST) STIPULATIONS......... NA <br /> <br />Y =Inspected end Found in Compliance PV =Inspected and Possible Violations Noted PB =Inspected an d Problems Nated <br />N =Not Inspected NA =Not Applicable <br />