Laserfiche WebLink
f — <br /> CIRCES Cost Estimating Software • <br /> EQUIPMENT MOBILIZATION I DEMOBILIZATION <br /> PROJECT IDENTIFICATION — <br /> Agency or organization name.DMG <br /> Tasks 002 State:Coknado Permitjob a:M-1977.451 <br /> Date' TVI3=0 County:San Miguel Abbreviation:rwne <br /> User. WHE Site:Ike ft.l Mine Filename:M451-002 <br /> Permit or other job action 941Revnw <br /> Task descnp'uon.Haul reclamation equipment to and from Job site <br /> EQUIPMENT TRANSPORT RIG COST Shill basis. 1 ye,day <br /> Cost data source: CRG Dole <br /> Truck tractor description.Generic a highway ouch tractor,6s4,diesel powered,400 HP <br /> Truck trader description:Generic Iolding gooseneck,drop deck equipment bale,(25T 50T,and.W T) <br /> Available rig capacmes 0 25 Tans I 26.§ Tons 51—Tons <br /> Cost Breakdown Ownership costrour f23.05 $2546 $2925 <br /> Operating cosOhour 325 62 32831 $30 D8 <br /> Operator cosMDur $2261 $22.61 $22.61 <br /> Helper cost1hour. $000 $21.82 $21.82 <br /> Total Unit Cost/hour $7228 $96.21 SIN67 <br /> NON- OADABLEEOUIPMENT <br /> Machine Weightlnit Ownership Haul Rig Fleet Size Haul Trip Rehm Trip DOT permit <br /> Descripban (Tons) Costlhrlund Cost'n0unit (No.units) CosI.hr0leet CosVhr6leel I Cost6leet <br /> -Regefshon Equip. f0.00 f10.00 $7228 1 $82.28 $72.28 W00 <br /> Subtobls: $82.28 $7Z28 Saw <br /> ROADABLE EQUIPMENT <br /> Machine Total Fleet Sue Haul Trip Retum Trip <br /> Descripban Castlhcudun (No unibl CosMrt6eet Coeviumeel <br /> Subtotals: $0.00 f0.00 <br /> EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town whin project area region' Dove Creek <br /> Transportaban Cycle Time Non. Total one-way travel distance' 30.0 miles <br /> Roadable Roadable Average travel speed: 300 mph <br /> Equipment Equipment <br /> Haul time(hours)= 1.00 1 W Total non roadable mobldemob cost' $473.68 <br /> Return lima(hours)z 100 1.00 -r.a laud sips.eh had dp <br /> Loading time(hours)6 0.50 NA Total wadable mob/demob cost" 50.00 <br /> Unloading time(hours)z 050 NA —on.wcl op.no toil rip <br /> Subtonl.z 3.00 2W <br /> JOB TIME AND COST Total job time' 6.06 hours <br /> Total job cost $474 <br />