My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-12-13_INSPECTION - M1977451
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977451
>
2000-12-13_INSPECTION - M1977451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 9:59:24 AM
Creation date
11/18/2007 8:02:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977451
IBM Index Class Name
Inspection
Doc Date
12/13/2000
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M IlIN99lllll III <br /> CIRCES Cost Estimating Software <br /> COST SUMMARY FORM <br /> PROJECT IDENTIFICATION <br /> Date: 13-Dec-2000 Permit or job no. : M-1977-451 Site :Ike No. 1 Mine <br /> User : WHE Abbreviation : none State:Colorado <br /> Filename. M451-000 County :San Miguel <br /> Agency or organization name :DMG <br /> Permit or job action :SR-01 review <br /> TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br /> NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> 001 -Revegetate 1 acre affected area revege 1 2.0 $950 <br /> 002 -Haul reclamation equipment to and from job site mobilize 1 6.00 $474 <br /> 003 -Remove misc. debris, assume 101 '5'W'5'H @ $0.221cf NA 1 1.0 $55 <br /> SUBTOTALS: 9.0 $1,479 <br /> includes inflation factor adjustment of: NA % TOTAL DIRECT COST•_ $1,479 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT- Liability Insurance: 1.55 % of direct total = $23 <br /> Performance bond : 1.05 % of direct total = $16 <br /> Job superintendent : NA' NA NA total = NA <br /> Profit : 10.00 %of direct total = $148 <br /> not required(or eqp.operator serves as super) TOTAL 0 d P= $186 <br /> CONTRACT AMOUNT(direct+0&P)= $1,665 <br /> PROJECT MANAGEMENT- <br /> Engineering work and/or contract/bid preparation : NA NA NA total = NA <br /> Reclamation management and/or administration : 5.00 %of cntr. NA total = $83 <br /> CONTINGENCY- NA' NA total = NA <br /> 'contingencies accounted for at tasklevel TOTAL INDIRECT COST= $270 <br /> TOTAL BOND AMOUNT(direct+ indirect) _ $1,749 <br />
The URL can be used to link to this page
Your browser does not support the video tag.