My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC01923
DRMS
>
Back File Migration
>
Inspection
>
INSPEC01923
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:57:07 PM
Creation date
11/18/2007 8:02:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983013
IBM Index Class Name
Inspection
Doc Date
6/3/1998
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />NA ~ No portals or shafts created. <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No. Task Description ~ Cost (E) <br />NA ~ No drill holes or monitoring wells created. <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ <br />________I__________________________________________________I_ Lost (E) <br />___________ <br />5 ~ Demolition assume mass 5'H*5'N*10'L a E0.22/cf ~ E55 <br />3 ~ Seeding per attached task 3 worksheet ~ E4,459 <br />NA I Fencing fencing not required at this time <br />4 ~ Mob/Demob per attached task 4 worksheet ~ 51,113 <br />Subtotal (M): E5,627 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E13,344 <br />II. INDIRECT COSTS <br />_ _ _ _ _ _______________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item Na.l Item Description ~ Cost (E) <br />______ <br />________I_____~___________________________________________I_ <br />1. ~ Public Liability Insurance.... 1.SSOX of dir. ~ _____ <br />E207 <br />2. ~ Contractor's Performance Bond 1.SSOX of dir. ~ E207 <br />3. ~ Contractor's Profit........... 10.OOY. of dir. ~ E1,334 <br />4. ~ Job Superintendent..equip operator serves as supe <br />___ <br />_____________________________________________________________ <br />Subtotal (A): ________ <br />E1, 748 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E15, 091 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.l Item Description ~ <br />________I__________________________________________________I_ Cost (E) <br />___________ <br />7. ~ Minerals Program Admin. Fee at S.OOX of cntr. E755 <br />_____ <br />_____________________________________________________________ <br />NET INDIRECT COST PERCENTAGE: 18.76X Subtotal (B): ______ <br />E755 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E2,503 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect casts): E15,846 <br />
The URL can be used to link to this page
Your browser does not support the video tag.