Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person BASIN RESOURCES, INC. Number C-013-81 Date 08/03/2007 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />B. <br />C. <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. 2 Liability Insurance <br />5. 2 Ownership and Contro] <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees --Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1. Drainage Contro] <br />2. Inspections 8: Certifications <br />3. Siltation Structures <br />4. Discharge Structures <br />5. Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage --Acid-Toxic Materials <br />10. Impoundments <br />11. Stream Buffer Zones <br />Topsoil & Subsoil <br />I. Removal <br />2. Substitute Materials <br />3._ Storage and Protection <br />D. Backfilling & Grading <br />1. Exposed Openings <br />2.^ Contemporaneous Reclamation <br />3., Approximate Original Contour <br />4. Highwall Elimination <br />5. Steep Slopes (includes downslope) <br />6. Handling of Acid & Toxic Materials <br />7. Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />1. Placement <br />2. Drainage Contro] <br />3. Surface Stabilization <br />4. Inspections & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles/lmpoundments) <br />1. Drainage Control <br />2. Surface Stabilization <br />3.~ Placement Ge <br />4. Inspections and Certifications Perf <br />5. Impounding Structures Cat <br />G. Use Of Explosives <br />1. Blaster Certification <br />2. Distance Prohibitions <br />3. Blast Survey/Schedule - <br />4. Warnings & Records <br />5. Control of Adverse Effects - <br />H. <br />I. <br />J. <br />K. <br />L. <br />M. <br />N. <br />neral <br />ormance <br />agory <br />_Subsidence Control Plan <br />Roads <br />1. Road Construction <br />2. Certification <br />3. Drainage <br />4. Surfacing and Maintenance <br />S._ Reclamation <br />Signs & Markers <br />1._ Signs <br />2. Markers <br />_Distance Prohibitions <br />Revegetation <br />1. Vegetative Cover <br />2. Timing <br />_Postmining Land Use <br />Other <br />A 2 1) cc-o7-aao-oaz <br /> Performance Standard Catagories E. Excess Spoil Disposal ...........................................(816/817.71-74) <br /> 30 CFR Counterpart 1. Placement ................................................................... ........................71(e) <br />A. Administrative .................................. ....................................... 2. Drainage Control ....................................................... .........................71(t) <br />1. Valid Permit ................................................... ..................................773.!1 3. SurfaceStabi]ization.................................................. .........................71(g) <br />2. Mining within Bonded Area .................. ..............................773.1 ] 4. Inspections & CeRifications....................................... ........................71(h) <br />3. Terms K Conditions of Permit ............... ..............................773.17 F. Coal Mine Waste (Refuse Pilesnmpoundments) ,, ,,,(gl6/817.81-84) <br />4. <br />5. Liability Insurance .................................. <br />Ownership and Control .......................... ..............................800.60 <br />................ .........778.13 <br />1. <br />Drainage Control ....................................................... <br />........................83(a) <br />6. Tem oraryCessation .................. <br />........... 842.11(e)&8]6/817.]31 2. <br /> <br />3. Surface~[abilization.................................................. <br /> <br />Placemen[............................ <br />.......... <br />.... <br />. ........................83(b) <br /> <br />83(c) <br />7. <br />8. AM Rec. Fees -- Non-Respondant ....... <br />AML Rec. Fees -- Failure to Pay ............ .........................870.15(b) <br />.........................870.15(a) 4. ..... <br />........... <br />. <br />....... <br />Inspections and Certifications.................................... ........................ <br />.......................83(d) <br /> 5. Impounding Structures ............................................... ............................84 <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br /> G. Use of Explosives .............................................. ....(816(817.61-68) <br />1. <br />2. Drainage Control .................................... <br />Inspections & Certifications ............... <br />... .....................................45 <br />49(a)(10) <br />.......................... <br />1. <br />Blaster Certification................................................... <br />........................61(c) <br />3. Siltation Structures ................................. .....................................46 2. D~stanceProhibitions................................................. ........................61(d) <br />4. Discharge Structures ............................. ......................................47 3. Blast Survey/Schedule................................................ .......................62-64 <br />5. Diversions .............................................. .....................................43 4. Warnings & Records .................................................. ....................66 & 68 <br />6. Effluent Limits ....................................... .....................................42 5. Control of Adverse Effects......................................... ............................67 <br />7. Ground Water Monitoring ..................... .................................41(c) H. Subsidence Control Plan.................................. .......(817.121-122) <br />8 . Surface Water Monitoring ..................... .................................41(e) I. Roads................................................................. (816/817.150-151) <br />9. Drainage--Acid -Toxic Materials .......... .................................41(f) <br />10 . Impoundments ....................................... .....................................49 1. Road Cons[ruction...................................................... .....................I50(c) <br />l t . Stream Buffer Zones .............................. .....................................57 2. Certification................................................................ ......................151(a) <br /> 3. Drainage ..................................................................... ..........150(b)-15](d) <br />C. Topsoil &Subsoil .............................. .................(816/817.22) 4. Surfacing and Maintenance........................................ ..........150(e)-15](d) <br />1. Removal ................................................. .................................22(a) 5. Reclamation............................................................... .......................1500 <br />2. Substitute Materials ................................ .................................22(c) J. Signs & Markers ............................................. ..........(816/817.11) <br />3. <br />4. Storage and Protection ........................... <br />Redistribution ......................................... ..................................22(c) <br />.................................22(d) <br />]. <br />Signs.......................................................................... <br />...........]1(a),(b),&(c) <br /> 2. Markers ......................................................._............. 11(a),(b),(d),(e);&(~ <br />D. Backfillin & Gradin <br />g t :.................... ..... 816/817.95-107 <br />..... ( ) K. Distance Prohibitions ...................................... .................(761.11) <br />]. Exposed Openings .....................816/817 .13, 14, 15, & 823.11 & 21 L. Revegetation..................................................... (816/817.111-116) <br />2. Contemporaneous Reclamation .............. ....................................100 <br />3. Approximate Original Contour ............... ...........................102(a)(1) ]. Vegetative Cover....................................................... ................11 I & 116 <br />4. Highwall Elimination .............................. ...........................102(a)(2) 2. Timing....................................................................... ...........................113 <br />5. Steep Slopes (includes downslope) ......... ...................................107 M. Postmining Land Use...................................... ........(816/817.133) <br />6. Handling of Acid & Toxic Materials ....... ...............................102(c) <br />7. Stabilization (tilts and gullies) ................ ..................................95(b) a~„~a December a, ivsa Page 2 of <br />