Laserfiche WebLink
• • <br />~' COAL BOND COMPLIANCE INSPECTION FORM <br />Mine (1 t., m rcac.,~ ~ ~ ••.a.. <br />Permit No. ~ - $ ~ -p~ ~ <br />Date 41a~19 <br />Part 3 -Support Facilities/Hydrol~ic Structures - <br />"-'^'~'~"1~1'FX <br />Permittee ~.; n~ rn[~ ~ r.r~i ~c.~.~.-.~ <br />Operator U ~.,,,~ .w.r K f ~s ~ ~,.-,., ~.J -. 7 ,- ~ <br />Inspector 1 u...4.J IZ .,,, <br />i <br />To be completed at Permit Renewal and <br />Midterm <br />1. Verify that all roads are documented in the permit. If not, list all undocumented roads and <br />their approximate width and length. Verify the type of surfacing used on each road <br />(gravel, asphalt pavement, etc.) <br />2. Verify that all ditches and diversions are documented in the permit. <br />width, depth, and length. <br />r <br />u.,~a ~,x l.; b ; -~ K IL <br />If not, list their <br /> <br />3. Verify that all culverts are documented in the permit. I`f not, list their diameter and length. <br />4. List the location, type of opening (drift, shaft, incline), and dimensions of all mine <br />openings. N o Ir,. rte- r;pa-.... ~-..y~ n.c.r+ cL .. ~,,, I l., , . -I~ ~ ~.,, ~..,, ~ a.c ~. <br />