My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC01736
DRMS
>
Back File Migration
>
Inspection
>
INSPEC01736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:56:52 PM
Creation date
11/18/2007 8:02:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
10/20/1999
Doc Name
MOUNTAIN COAL CO LLC WEST ELK MINE PN C-80-007 3RD QTR 1999 STOCKPILE SITE & POND INSPECTION REPORTS
From
MOUNTAIN COAL CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />Table 36A Approximate Topsoil Stockpile Volumes for the Refuse Pile <br />Expansion (RPE) Area and Sylvester Gulch Facilities Area at the <br />West Elk Mine Site _ i _ <br />Location' bta~dmum Storage Volume (C]0 Actual Storage Volume (C]0 <br />North Soil Storage Area' <br />Topsoil 24,000 1 <br />Subsoil 30,640 1 <br />Sylvester Gulch Topsoil Stockpilez <br />Shafr ql and q2 Topsoil Stockpile 46,000 46,000 <br />Topsoil Stockpile ql 50,000 30,500 <br />sQ :_.~ <br />Topsoil Stockpile q3 13,000 13,000 <br /> <br /> <br />Topsoil.Stockpile q5 20,500 5,298 <br />Topsoil Stockpile q6 6,300 2,000 <br />Topsoil Stockpile q2 (Live)° 15,200 Varies <br />Sylvester Gulch Power Pole Roads Topsoil Stockpile <br />Pole 9 45 <br />Pole 10 45 <br />Pole 11 100 <br />Pole 12 22 <br />Pole 13 45 <br />Pole 14 55 <br />Pole 15 33 <br />Pole 16 22 <br />Pole 17 45 <br />1. Actual storage volumes will vary depending on the phase of conswction and reclamation of the RPE area See Table 1 in <br />Exhibit 70, which details the amount of soil that i5 stripped during each phaze. <br />Z. Volumes calculated by Golder Associates for Sylvester Gulch Facilities Area (11/96 PR07). <br />3. Locations of stockpiles shown on Map 53B. <br />4. Live Subsoil Stockpile to be used throughout Sylvester Gulch Facilities Area construction. <br />2.05-54 Revised Nov. /996 PR07R; Revised Jan. /997 TRi9; Revised Jul. 1997 hIRI/9; Revised Aug. 1997 MR120 <br />Revised Sep. 1997 MR11 S; Revised Apr., 1998 ,NR1 fI; <br />
The URL can be used to link to this page
Your browser does not support the video tag.