Laserfiche WebLink
(Page 31 <br />MINE ID # OR PROSPECTING ID # M-77-022 <br />INSPECTION DATE 6-17-97 INSPECTOR'S INITIALS SSS <br />The following problems IPBI and/or possible violations IPVI land suggested corrective actions) were identified during this inspection. <br />The problems should be corrected by the dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The inspector noted <br />on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The permit file for this operation does not include a Performance Warranty. 08/1 5/97 <br />PB or PV PB <br />CORRECTIVE ACTION TOPICISI AR <br />Please fill out and sign the enclosed form, have it notarized, and return the original _, _ _ <br />to the Denver office of the Division, to the attention of Lavern Lemay. Please include an <br />explanation for Lavern's clarification. <br />2. Boundary markers are not adequately placed to delineate the permit boundary. 08/15/97 <br />PB or PV PB <br />CORRECTIVE ACTION TOPICISI SM <br />Please install additional permit boundary markers to accurately delineate that boundary. _, _, _ <br />3. Cement trucks have been dumping excess concrete on site and have been washing out the cement 08/15/97 <br />mixer trucks onsite. The approved permit does not provide for this activity. PB or PV PB <br />TOPICISI HB <br />CORRECTIVE ACTION PW, _, _ <br />Clean up and properly dispose of the waste concrete, and refrain from conducting any more <br />cement truck clean-out within the permit area. <br />4. Pond indicated in original permit and indicated to be part of the reclamation plan, no 08/15/97 <br />longer exists. ~ PB or PV PB <br />CORRECTIVE ACTION TOPICISI RS <br />Please submit a revision to the permit which indicates Delta Sand and Gravel's revised -_ _, _ <br />reclamation and operational plans for this site, or explain how the operation will still <br />comply with the approved reclamation plan. <br />