Laserfiche WebLink
ANNUAL BOND COMPLIANCE TRACCiNG <br />Mine: GEC Mine <br />Date: 7/21/92 <br />Bond Inspection Topic: Revegetation <br />Inspected Area <br />Legal Description (Accurate to 1/4 1/4 Section) <br />Township 205, Range 69W <br />Acreage: 1.55 acres <br />Narrative Location Description: 1.55 acre recta <br />area, for which Harrison Western has responsib <br />" Date Final Grading Completed: Fali, 1985 <br />'* Date Topsoiling Completed: Fall, 1985 <br />** Date Initial Seeding Completed: Fa11, 1985 . <br />'* Date Final Seeding Completed: June, 1992 <br />Map Reference: Exhibit 1 to 4/22/92 Board Compl <br />Inspection Procedure <br />n <br />~ Two transects were run on each side of the reclaimed drainage. The transects <br />were of variable le:.;t::, T1 SOm, T2 50m, T3 = 175m,Tq = 145m. <br />(Cover was estimated using a tripod mounted ocular point bar. Woody plants were <br />essentially absent from the stand and no density estimate was attempted. <br />i Data Summary <br />(Reference any tables, diagrams or maps attached) <br />See Attachments 1 and 2 . <br />Narrative Evaluation of Compliance <br />See ,4ttachmertt 3. <br />' A separate tracking sheet should be titled out for each area and compliance <br />topic evaluated. <br />Permit No.: C-81-037 <br />Inspector: Dan Mathews <br />Rule: 4,15 <br />NW 1/4 NE 1/4 Section 30, <br />Pi <br />" If applicable <br />