Laserfiche WebLink
<br />MINE I:D # OR PROSPECTING ID # <br />INSPECTION DATE 3-31-98 <br />(Page 3) <br />M-94-117 <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />INSPECTOR'S INITIALS GC <br />CORRECTION <br /> DATE <br />1. Water is overtopping the Hazel A bulkhead and 4-17-98 <br />is being pumped back to the tailings pond PB or PV PB <br />with the coffer dam pump. This pump is not TOPIC(S) HB <br />designed for the task. <br />Corrective Action: No later than 4-16-98, <br />submit to the Division and get approved a <br />plan to ensure continued pumping from the <br />Hazel A adit. Complete the corrective action <br />no later than 4-17-98. <br />2. The pump back system between the mill and the 4-27-98 <br />Hazel-A adit is in disrepair and the PB or PV PB <br />evaporative system is not operational. TOPICS} SF <br />Corrective Action: Repair or replace the pump <br />behind the Hazel-A bulkhead, repair all <br />broken lines in the system, close the decant <br />line between the tailings pond and the Hazel- <br />A adit, and bring the pump back and <br />evaporative system into proper operating <br />order no later than 4-27-98. <br /> <br />3. <br />PB or PV <br />TOPIC(S) <br />