Laserfiche WebLink
=~E~vC U. S. DEPT. OF THE INTERIOR <br />~FFICE OF SURFACE MINING <br />tR 0'7 2000 Mine Site Evaluation <br />of Minaral~ 8 Geology State Program <br />iii iiiiiiiiiiiii iii <br />999 <br />~ j 4s p <br />o~~c~ <br />~°FSUR6+~E~2 <br />I. Pennittee/Person 9. Permit Number 10. Permit Type <br /> LOADSTAR ENERGY, INC. C-020.81 PP <br />2. Address 11. Field Visit Date l2. Purpose 13. SRA Present <br /> 2768 COMPASSDRIVE,SUITE i0- 03/29/2000 O~ Y^ <br />3. City 4. Stale mm - dd -yyyy <br /> 14. Permit Status I5. Si[e Status 16. Facility Type <br /> Grand Junction CO ~ TC <br /> <br />5. Zip Code 6. Phone Number <br />l7. OSM Office # <br />I8. CCID # <br />19. Land Code <br /> 81506 (435)637-9200 <br /> 140 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> SAME GARFIELD <br /> OS-03119 CO <br />8. Mine Name <br /> 23. AVS Perrnittee Entity ID Number 24. State Office <br /> MUNGER CANYON <br /> 056839 ~ I <br />25. Hours 26. S' nature Bloc 27. Reviewing [ficial: <br />1.0 a. Permit Review J <br /> <br />2.0 b. Site Visit Time i tature: Signature: <br /> HENRY AUSTIN H) # 116 <br /> <br /> 5 <br />0 Travel Time <br />c Review Dale: l 3l t77J <br /> . . Printed Name: mm - dd -yyyy <br />i 1,5 d. Report Writing Date: 04/03/2000 Is Supplemental MSE Page Used Y/N Y^ <br />Permlt Type -Item 10 IP =Intedm Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Reteral (non site visit) <br />0~,,, Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fx;;..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector eny time during the review of the mine site. <br />Permlt Status -Item 14 AB.... Abandoned: All surface and underground coal miningg activities have ceased and <br />operator has lek the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation ectivkies occurring or 30 CFR &40.11(8 <br />Pertniked but not yet disturbed. A61..Bond Forfeiture: ~ond lorteiture officially in process or completed, and. <br />IN.... nactive (Permanent Program Permlt): Phase II completed or reclamation In progress or not yet wmmenced. <br />Temporary Cessation o1 Operations. (Intedm Program Permlt) A82..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and recamation activities initiated. used to redaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Pmgram standards. <br />Authodry (RA) has released all of Ne bond (Phase III Release.) NA...Not Applicable: When site is unpertnitted. <br />Site Status Codes -Item 15 NS.. Non•Site Visit: Status of site not determined. <br />ND..No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on ske, FP.. Forfeiture Pending The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has gmnted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessaLon of mining pursuant to 30 CFR 616/ lion of lorfeited site is in progress. <br />have not begun. 617.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Ccal Producing: Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For intedm FO.. Abandoned Site: Abandoned site that <br />qN„ Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facilittyy such es tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />NM..No Mning: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal p3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining actiwry, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Andllary (Haulroad, Conveyor, and/or Rails) H...6cploration Permits L... Remining site ppermitted <br />A... Sudace E... Refuse and/or Impoundment 1... Notice of Intent to Explore under 30 CFR785.25 <br />8... Underground F... Loatling Facility and/or Tipple J... Exempt 16 and Z3 <br />C... Preparation Plant G... Stockpiles K...Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. If you are a small business (a business with SIXI or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call I-888-REG-FAIR (I-888-734-3247). a~.~,d o«~~mk~+. iwa <br />