My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC01568
DRMS
>
Back File Migration
>
Inspection
>
INSPEC01568
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:56:47 PM
Creation date
11/18/2007 8:01:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982147
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/28/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CIRCES Cost Estimating Software <br />COMPACTION WORK <br />HOURLY EQUIPMENT COST Make and model :CAT 825G Horsepower : 315 <br /> <br />Compactor type :Reclamation Shdt basis : 1 per day <br /> <br /> Uuliza[ion o Cosl tlata source: (CAGJ <br />Cost Breakdox~n : Ownership crosUhour : $70.99 NA <br />Operating cosVhour: $60.72 100 <br />Operator cosVhour. $27.55 NA <br />Total unit cost/hour: $159.26 Total lleet cosvhour: $477.78 <br />PROJECT IDENTIFICATION <br />Agency or organization name: Division O/ Minerals 8 Geologuy <br />Task x: 003 State :Colorado PenniVlob x:M-B2-147 <br />Data: O6-Apr-2001 County :Adams Abbreviation ;none <br />User: TAS Site: Nyhott Pit Filename:M/47-003 <br />Permit or olherjob action :Final Reclamation <br />Task descdpticn :Compact sha/e/c/ay liner <br />Compacted <br />volume: 96.112 CCV <br />Elemenli.: Compacted width per pass : 738 lest <br />Average compactor speetl: 2.00 mph <br />Compacted thickness of each litt : 6.00 inches <br />Conversion constant : 16.3 <br />Required number of machine passes : 8 passes <br />MATERIAL OUANTRIES <br />Loose Shrinkage <br />volume: 128,150 LCV factor: 0.750 <br />Source of quantity lake-off :permit <br />Source of material shrinkage lactor :program <br />HOURLY PRODUCTION <br />Unadjusted hourly unit production : 780.44 CCY/hr <br />Job Condition Correction Facton; <br />Site altitwie : 6,000 leer <br />JOB TIME AND COST <br />Fleet size: 3 Compactor(s)U <br />Unit cost $1.063 /CCV <br /> Souce <br />Altitude adjustment lactor; 1.00 (Cat HB) <br />Job efficiency factor: 0.83 (I sh~fUday) <br />Net rob correction : 0.83 multiplier <br />Atllusted hourly unit production : 749.77 CCY/hr <br />Adjustetl hourly Ileet production : 449.30 CCY/hr <br />Total job time : 213.92 Hours <br />Total job cost: $102,205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.