My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC01568
DRMS
>
Back File Migration
>
Inspection
>
INSPEC01568
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:56:47 PM
Creation date
11/18/2007 8:01:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982147
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/28/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />COMPACTION WORK <br /> Agenty or orgeinization name : Dlvrsicn OI Minerals 8 Geology <br /> <br />Task# : 003 State:Colorado PermiVlob#:M-82-147 <br />Date : O6-Apr~2001 County :Adams Abbreviation :none <br />User : TAS Site :Nyholf Pil Filename :M747-003 <br /> <br /> Permit or olherjob actir~n :Final Reclamation <br /> <br /> Task description : COTPBCf Shale/CI9Jr llne/ <br /> <br />HOURLY EQUIPMENT COST Make and model: CAT825G Horsepower: 315 <br /> <br /> Compactor type:Reclamation Shift basis: fper tlay <br /> Utihzation % Cost data source: (CRG) <br /> Cost Breakdov~ Ownership wsUhour: $70.99 NA <br /> Operating cosVhour: $60.72 100 <br /> Operator cosVhour: $27.55 NA <br /> Total unit cosUhour: $159.26 Total lleet cosUhour: $477,78 <br /> <br />MATERI AL QUANTITIES <br />Loose Shrinkage Compactetl <br />volume : 153.694 LCV lector: 0.750 volume: 115,270 CCY <br /> Source of 4uantiry take-oH : program <br /> <br /> Source of material shrinkage factor :permit <br />HOURLY PRODUCTION <br /> Fleme y5_; Compaced witlth per pass : 7.38 lest <br /> Average compactor speetl: Z.00 mph <br /> Compacted Thickness of each lift : 6.00 inches <br /> Conversion constant : 16.3 <br /> Reqwrad number of machine passes : 8 passes <br />Unadjusted hourly unit pmtluclion : IH0.44 CCV/hr <br />Job Condition Cortection Factori <br />Site altitutle: 5,500 feet <br /> Source <br />Altitude adjustmem lector : 1.00 (Cal HB) <br />Job eHicienty lector: 0.93 (l shifVday) <br />Net job correction: 0.83 multiplier <br />Adlusted hourly unit production : 149.77 CCY/hr <br />Adlusted houdy Ileet production : 449.30 CCY/hr <br />JOB TIME ANO COST <br />Fleet size : 3 Compactor(s)U <br />Unit cost : $1063 /CCY <br />Total job time : 256.56 Hours <br />Total job cost $122,577 <br />
The URL can be used to link to this page
Your browser does not support the video tag.