Laserfiche WebLink
0 <br />PLATIF~ON~ <br />COMPANIfSi ~ <br />Mr. Mike Savage <br />Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />~ III Illlllllllllllll <br />WALDEN COAL COMPANY <br />POST OFFICE BOX 229. BOULDER. COLORADO 80.306 <br />PNONE: (303) 44d-2151 <br />December 1, 1982 <br />~41Pu:~ ~ nn,:I 1 <br />CL.ir~.I,...r <br />Dear Mr. Savage: <br />r I I J. <br />r•.,~i~N <br />This letter is Walden Coal Company's response to your inspection report <br />dated November 23, 1982. <br />On November 29,'•1982, Walden Coal Company seeded topsoil stockpile C and <br />all of the sedimentation pond dams in order to stabilze these structures. Topsoil <br />stockpile C was constructed, as designed, with 2:1 side slopes. These slopes <br />should be stable once a vegetative cover is established on them. Topsoil stockpile <br />A is still an active topsoil dump and therefore will not be seeded this fall. This <br />stockpile will be seeded as soon as possible after dumping has been completed. <br />As mentioned in my letter dated November 24, 1982, all perimeter signs were <br />placed at the loadout on November 22. <br />I hope this letter has clarified the issues addressed in the latest inspection <br />report. <br />Sincerely, <br />Kay am <br />Resour a Manager <br />~'~. <br /> <br />