Laserfiche WebLink
(Page •I) <br />MINE ID # OR PROSPECTING ID # M-99-O:LB <br />INSPECTION DATE 06/08/99 INSPECTOR'S INITIALS CLK <br />The following problems (PB) and/or possible ~~iolations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible viol.stions. The possible violations should be <br />corrected by the dates given to reduce their ;severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on th~a previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTI~~NS <br />CORRECTION <br />DATE <br />The boundaries of the site are not well-defined, which could lead to possible off- July 12, 1999 <br />site damage if left uncorrected. Clear boundaries are required under Rule PB or PV PB <br />3.1.12(2) of the Construction Materials Rules and Regulations. CORRECTIVE TOPIC(S) SM <br />ACTION: Install more boundary markers or berms defining the boundaries, and <br />send evidence of same (photos) to DMG within 30 days. <br /> <br />3. <br />PB or PV <br />TOPIC(S) <br />PB or PV <br />TOPIC(S) <br />