Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />This was an aerial inspection of the Hamilton Mine conducted by Harry Ranney of the DMG. <br />Aerial photographs were taken on November 23, 2005. Weather conditions were cleaz and <br />sunny at the time of the flight. Mike Boulay of the DMG reviewed the aerial photographs. <br />Four photos were taken during the flyover. No problems were noted in any of the aerial <br />photographs. <br />Roads <br />Roads leading to Mine Area 1 and to the sedimentation ponds were visible in the photographs. <br />Roads were dry and appeazed to be in good condition. <br />Hvdtrologic Balance <br />The site was free of snow cover and appeazed mostly dry. Sedimentation Ponds A and B were <br />viewed. Pond B was retaining a small amount of water and Pond A was dry. No problems were <br />noted at any of these sediment pond locations. <br />