Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken dunng the mspection <br />and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Ohio Creek #2 Coal Mine for the month of March, 2002. The <br />weather was extremely foggy and snowing at the site. The snow was too deep to travel through. <br />~drologic Balance: The site is still covered with snow. as can be seen from the photo, therefore <br />nothing could he determrned as to the condrt~on of the site. <br />No problems were observed. <br />Reclamation Success: Not applicable at this time. <br /> <br /> <br /> <br /> <br />~~ •~. <br />.- <br />- I ~ <br />~ w a~ <br />• ' `'r ~ ' <br />-~'~ ' 2002 3 1 B <br />