Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />P ~~ ~ ~(7-OBf <br />Below are comments on the inspection. The com ~ents include discs~on~of o~ ations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Hayden Gulch Mine conducted by Jim Stark of <br />CDMG. The mine has gone through a Phase I and Phase II Bond Release on all but <br />approximately nine acres. The weather was cold and clear and the ground was <br />covered with at least a foot of snow. <br />All of the necessary records were available for review at the Montgomery Watson <br />Harza office in Steamboat Springs. Please see the records checklist at the end of the <br />report for more details. <br />Because of the large amount of snow, and the fact that the county piles snow at the <br />entrance to the site, most of the site was inaccessible at the time of the inspection <br />(and will probably remain that way until late spring). <br />Shrub parcel HG-08 was observed from the county road. The parcel appeared to be <br />stable at the time of the inspection. The pond contained water but was not <br />discharging at the time of the inspection (although the pond is no longer a part of <br />the HG Mine permit). <br />Shrub Parcel E was inaccessible at the time of the inspection. <br />Shrub parcel 003 was also observed from the county road. The parcel appeared to <br />be stable at the time of the inspection. Pond 003 was dry at the time of the <br />inspection. <br />The 1997 slump area was inaccessible at the time of the inspection. <br />