Laserfiche WebLink
<br /> <br />(Page 4) <br />NINE ID ~ OR PROSPECTING ID / ~f-80-246 <br />INSPECTION DATE 11/28/94 INSPECTOR'S INITIALS ACS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />~N <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 <br />11 / 28 / 94 <br />PB or PV PB <br />TOPIC(S) HP <br />2. Steel balinc wire utilized in an application directly on 11 / 28 / 94 <br />toy of VI.DPE liner. <br />PB or PV P8 <br />TOPIC(S) HP <br />Load out of oversize rocks from the pad area not completed <br />effectively or efficiently. <br />