Laserfiche WebLink
<br />III. Corrcnents - Compliance <br />Below are particular issues with regard to any of the above compliance items. Enforcement <br />actions resulting from failure to comply with the Act, Rules and Regulations, and the permit <br />also are identified below. <br />Hydrologic Balance (4.05) . <br />The small amount of water contained in the pit is being used for dust suppression <br />on the mine roads. The pipe allowing water to be pumped from the pit into pond Cis <br />still in place, but not currently under use. Some ground water inflow into the pit <br />continues. • <br />Clay has been placed in the bottom of pond Bin order to seal it. The pond was <br />holding a small amount of water. <br />Coal fines and shale had been cleaned up from I.1ann Draw where they had been deposited <br />by pumping activities. <br />Backfilling and Grading (4.14) <br />The southeast portion of the east dump is almost a± final grade. The operator is <br />plannipg to spread topsoil and seed this area this fall, following completion of <br />overburden grading. <br />,~ r: <br />