Laserfiche WebLink
I~ /, .~G n~iJ~~ C~IIC ~~l -d d~- <br />y 3 fa•.~ vj ~Z~ <br />Miscellaneous (cont): As noted above, there are only two fuel/oil tanks in the current <br />reclamation cost estimate and permit and 10 tanks on the ground. The Division will <br />need to get a better inventory and have the permit and reclamation cost estimate <br />updated to reflect current conditions on the ground. Additionally, the Division will <br />add costs for petroleum-contaminated soil (PCS) clean up in the area of the fuel <br />tanks. <br />All of the structures (with the exception of the two trailers that are behind the office <br />and shop buildings) are in the permit and the reclamation cost estimate and the <br />measurements taken on the ground correspond with what is in the permit and <br />reclamation cost estimate. The two trailers will need to be added to the permit and <br />reclamation cost estimate. <br />