Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ POWDERHORN COAL CO. Permit C-041-S1 Field Visit 05/21/2003 Continuation Page <br />Person Number Date <br />28. Performance Standard Categories <br />Codes: 1=Compliance. 2=Noncomoliance, 3=Not Planned. 4=Not Started, S=Noncomogance Identified ewhere, 6=Previously Clted <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Contro] <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Pees -- Failure to Pay <br />B. Hydrologic Balance <br />1._ Drainage Control <br />2._ Inspections & Certifications <br />3._ Siltation Structures <br />4._ Discharge Structures <br />5._ Diversions <br />6._ Effluent Limits <br />7._ Ground Water Monitoring <br />8. Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11._ Stream Buffer Zones <br />C. TopsoB & Subsoil <br />1._ Removal <br />2._ Substitute Materials <br />3._ Storage and Protection <br />D. BackfilBng & Grading ,Subsidence Control Plan <br />H. <br />1. 1 Exposed Openings - <br />I. Roads <br />2. 1 Contemporaneous Reclamation Road Construction <br />1. <br />3. 1 Approximate Original Contour _ <br />2. Certification <br />4. _ Highwall Elimination 3._ Drainage <br />5. _ Suep Slopes (includes downslope) 4._ Surfacing and Maintenance <br />6. 1 Handling of Acid & Toxic Materials 5. Reclamation <br />7. 1 Stabilization (rills and gWlies) J• Signs & Markers <br />E. Excess Spoil Disposal 1._ Signs <br />1. _ Placement 2. Markers <br />2. _ Drainage Control I{. distance Prohibitions <br />3. _ Surface Stabilization <br />L. Revegelatlon <br />4. Inspections & Certifications Vegetative Cover <br />1. <br />F. Coal Mine Waste _ <br />Timing <br />2. <br />(Refuse Piles/Impoundrnents) _ <br />Pos[minhtg Land Use <br />M. <br />1. 1 Drainage Control _ <br />2. <br />3. 1 Surface Stabilization <br />1 Placement General N. Outer <br />RECEIVED <br />4. 1 Inspections and Certifications Performance <br />5. _ Impounding Structures Category NOV 142003 <br />G. Use Of Explosives 1) <br />1. _ Blaster Certification _ <br />2. Distance Prohibitions 2) Oirision tai Minerals attd Geabgt! <br />3. _ Blast Survey/Schedule _ <br />4. Warnings & Records 3) <br />5. Control of Adverse Effects _ <br />I A. <br />B. <br />Performance Standard Categories <br />30 CFR Counterpart <br />Adminlstradve <br />: <br />: <br />.................................................................. <br />.... <br />. <br />1. Valid Pertnit .....................................................................................773.11 <br />Z. Mining within Bonded Area .................. ..............................773.11 <br />3. Tetras & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance .................................. ..............................800.60 <br />S. Ownership and Control .......................... ..............................778.13 <br />6. Temporary Cessation ..............................842.11(e) & 816/817.131 <br />7. AML Rec. Fees --Non•Respondent ................................870.15(b) <br />8. AML Rec. Fees --Failure to Pay ............ .........................870.15(e) <br />Hydrologic Balance ......................................(516817.41-57) <br />1. Drainage Control ................................................. ........................45 <br />2. Inspections &Certifications ................................ .............49(a)(10) <br />3. Silta(ion Structuros .....:........................................ ........................46 <br />4. Discharge S[mctures ..:........................................ ........................47 <br />5. Diveisions ............................................................ .......................43 <br />6. F.ffiuent Limits ..................................................... .......................42 <br />7. Ground Water Monitoring ................................... ...................41(c) <br />S. Surface Water Monitoring ................................... ...................41(e) <br />9. Drainage-Acid -Toxic Materials ........................ ...................41(t) <br />10. Impoundments ..................................................... .......................49 <br />11. Stream Buffer Zones ............................................ .......................57 <br />I c. <br /> <br />Topsoil &Subsoil ................».............................(816817.22) <br />1. Removal ................................................... ...............................22(a) <br />2. Substltute Mazeriazs .................................. ...............................22(c) <br />3. Storage and Protecdon .............................. ...............................ZZ(c) <br />4. Redistribution ........................................... ...............................22(d) <br />Bacldilling & Grading ..............................(816817.95-107) <br />1. Exposed Openings .....................816/817.1 3, 14, I5, & 823.11 & 21 <br />2. Contemporaneous Reclamatron ................. .................................100 <br />3. Approximate Original Contour .................. ..._............,......102(a)(I) <br />4. Highwall Elimination ................................. ........................102(a)(2) <br />5. Steep Slopes (includes downslope) ............ ................................107 <br />6. Handling of Acid & Toxic Materials ......... .............................102(c) <br />7. Stabilization (rills and Bullies) ................... ...............................95th) <br />E. Excess SpoO Disposal ...........................................(816/817.71.74) <br />1. Placement .................................................. .........................................71(e) <br />2. DrainageConnol ...................................... .........................................71(f) <br />3. SurfaceStabilization ................................. ..........................................71(8) <br />4. Inspections & Cenifications ...................... .........................................71(h) <br />F. Coal Mine Waste (Reaise PBes/Impoupdmenta) ...»(816/817.81-84) <br />I. <br />2. <br />3. <br />4. <br />5. <br />G. <br />1. <br />2. <br />3. <br />4. <br />5. <br />H. <br />I. <br />1. <br />2. <br />3. <br />4. <br />5. <br />J. <br />I. <br />2. <br />K. <br />L. <br />1. <br />2. <br />M. <br />Drainage Control ..................................................... ..........................83(a) <br />Surface Stabilization ................................................. .........................83(b) <br />Placenunt .................................................................. .........................83(c) <br />Inspections and Certifications ................................... ........................83(d) <br />Impounding Stmctures .............................................. .............................84 <br />Use of Explostves ................................»..-.............(816817.61-68) <br />Blaster Cettification .................................................. .........................til(e) <br />Distance Prohibitions ................................................ .........................6](d) <br />Blast Survey/Schedule ............................................... ........................62-64 <br />Warnings & Records ................................................. .....................66 8c 68 <br />Control of Adverse Effects ........................................ .............................67 <br />Subsidence Control Plan .........................................(817.121-122) <br />Roads .................................................................{516817.150-151) <br />Road Construction ..................................................... ......................150(c) <br />Cettificatioa ............................................................... .......................151(a) <br />Drainage ..................................................................... ..........150(b)-151(d) <br />Surfacing and Maintenance ........................................ ..........150(e)-151(d) <br />Rec]amation ............................................................... .......................1500 <br />Signs & Markers .......................................................(816817.11) <br />Signs .......................................................................... ........... l l (a).(b),8t(c) <br />Markers ...................................................................... 11(a),(b)~(d)~CW,&0 <br />Distance Prohibitions .......................................................(761.11) <br />Revegetation .................................................... .(S16/817.111-116) <br />Vegetative Cover ....................................................... ................111 & 1 ]6 <br />Timing ....................................................................... ...........................113 <br />Postmintng Lsnd Use ...................................... ........(816/817.133) <br /> e 2 of S <br />Pa <br />a..~n.~wY.a.issa g <br />