My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC00468
DRMS
>
Back File Migration
>
Inspection
>
INSPEC00468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:57 PM
Creation date
11/18/2007 7:55:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Inspection
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
7/12/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person WESTERN FUELS - Number C-008-81 Date 07/12/2001 Continuation Page <br />28. Perform <br />3=Not Planned, 4=Not <br />A. Administrative <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. ~ Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees -- Non-Respondent <br />$. 1 AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4. ~ Discharge Sructures <br />5. 1 Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8. 1 Surface Water Monitoring <br />9. 3 Drainage -- Acid-Toxic Materials <br />10. 1 Impoundments <br />11. 3 Stream Buffer Zones <br />C. Topsoil S Subsoil <br />1. 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />A. <br />D. <br />rd <br />Elsewhere, 6=Previously Cited <br />H. 3 Subsidence Control Plan <br />I. Roads <br />1. 1 Road Construction <br />2. 2 Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. 1 Reclamation <br />J• Signs & Markers <br />1. 1 Signs <br />2.~ Markers <br />K. 1 Distance Prohibitions <br />L. Revegetation <br />I. 1 Vegetative Cover <br />~. 1 Timing <br />M. 1 postmining Land Use <br />N. Other <br />Backfilling & Grading <br />L 1 Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4. 1 Highwall Elimination <br />5. 3 Steep Slopes (includes downslope) <br />6. 3 Handling of Acid & Toxic Materials <br />7. 1 Stabilization (rills and gullies) <br />Ezcess Spoil Disposal <br />1. 3 Placement <br />2. 3 Drainage Control <br />3. 3 SurfaceStabilization <br />4. 3 Inspections & Certifications <br />Coal Mine R'aste <br />(Refuse Piles/Impoundments) <br />1. 3 Drainage Control <br />~. 3 Surface Stabilization <br />3. 3 placement <br />4. 3 Inspections and Certifications <br />5. 3 Impounding Structures <br />Use Of Explosives <br />1. 1 Blaster Certification - <br />2. 1 Distance Prohibitions <br />3. 1 Blast Survey/Schedule - <br />4. 1 Warnings & Records <br />5. 1 Control of Adverse Effects - <br />E. <br />G. <br />Performance Standard Catagories <br />30 CFR Counterpart <br />7. Valid Permit........._.:.......__.....__....._.._... ...._ ...............................773.11 <br />2. Mining within Bonded Area...... _...._ . .................................773.11 <br />3. Terms & Conditions of Permit ............ .................................773.17 <br />4. Liability Insurance ............................... .................................800.60 <br />5. Ownership and Conuol ....................... .................................778.13 <br />6. Temporzry Cessation..........._ .............. ...842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondant .... ............................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ......... ............................870.15(x) <br />$. Hydrologic <br />(816/817.41-57) <br />1. Drainage Control ............................................ .............................45 <br />2. Inspections &Certifications ..............._..._..... ..................49(x)(]0) <br />3. Sika[ion Siruciures ................................._...... .............................46 <br />4. Discharge Structures ................._.................. .._......._.................47 <br />5. Diversions ....................................................... ............................43 <br />6. Effluent Limits ............................................... .............................42 <br />7. Ground Water Monitoring .............................. ........................41(c) <br />8. Surface WatenMoniroring._..........._...._....... _ .............._.......41(e) <br />9. Drainage--Acid-Toxic Materials ............._... ..........._....._.....41(f) <br />] 0. Impoundments .........................._........... _....... _..... _.............,.....49 <br />I1. Stream Buffer Zones........._.......__ ................. ......_..............__.57 <br />C. Topsoil &Subsoil ...............................................(816/517.22) <br />1 . Removal..........._ .............._...._......__.........__. ._....._........--33(x) <br />Z. Substitute Materials .......................................... ..... _.......___...22(c) <br />3. Storage and Protection ..............._.._................. _... _.. _...... _....22(c) <br />4. Redistribu[ion._...._.._....__ ................._.._...__ ......._..._....._.32(d) <br />D. Backfilling & Grading ............................. .(816/817.95.107) <br />1. Exposed Openings .....................8]6/817.]3, 14 , 15, & 823.11 &2] <br />2. Contemporaneous Reclamation..........._._ ......... ..........__...........100 <br />3. Approximate Original Contour.....__......_ ......... ............_..102(x)(1) <br />4. Hiehwall Elimination....._............ _ .............._.... .......__.....102(x)(2) <br />5. Steep Slopes (includes downslope)............_...... .._ ....................107 <br />6. Handling of Acid & Toxic Materials...._...._...... .._...._..._.....102(c) <br />7. Stabilization (rills and gullies) ............................ .........._..........95(6) <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ................._....................,......._................ ..........................71 (e) <br />2. Drainage Control ..................................._............._ ........................... 71 (f) <br />3. Surface Stabi]ization ............................................... ............................71(x) <br />4. Inspections & Certifiications.__ ............................... ...........................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,.($16/817.81-84) <br />1. Drainage Control .................................................... ...........................83(x) <br />2. Surface Stabilization ..................................._........... ...._.......__.........83(6) <br />3. Placement ................................................................. ..........................83(c) <br />4. Inspections and Certifications.......:._ ....................... .........................83(d) <br />5. Impoundin, Structures ............................................. ..............................84 <br />G. Use of Explosives ................................................_(816!817.61-68) <br />1. Blaster Certification ................................ ...........................................61(c) <br />2. Distance Prohibitions .............................. ...........................................61{d) <br />3. Blast Survey/Schedule ............................ ...........................................62-64 <br />4. Warnings &~ Records .............................. ........................................66 R 68 <br />~. Control of Adverse Effects .............._._.. ......................._..................._..67 <br />H. Subsidence Control Plan ................ .........................(817.121.122) <br />I. Roads ..........................................:..... .................(816/817.150-151) <br />1. Road Construction ................................... ........................................150(c) <br />2. Certification ........................._....._._....... _.........._..__......................151(x) <br />3. Drainage ................................................... ............................150(6)-I51(d) <br />4. SurfacingaadMaintenance ..................... ._..........................150(e)-151(d) <br />5. Rec]amation._..__...._.__ ...............__...... ......................_..._............150(t) <br />J• Signs & Markers ............................ ...........................(816/817.11) <br />1. Signs............_..........._..........__......._ ...... ...............__..........11(a),(b),B:Cc) <br />2. Markers ................._............._......_.......... .__.............I1(a),(b),(d),(e),&(f) <br />K. Distance Prohibitions ...................... .................................(761.11) <br />L. Reregetation .................................... .................(816/817.111-116) <br />I. Vegetative Cover ................_................... .._...................__.......]]1&ll6 <br />2. Timing ...................................................... _......................__..............-lli <br />M. Postmining Land <br />Rwisea <br />6/817.133) <br />2 of~ <br />General <br />Performance <br />Catagory <br />
The URL can be used to link to this page
Your browser does not support the video tag.