My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC00464
DRMS
>
Back File Migration
>
Inspection
>
INSPEC00464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:57 PM
Creation date
11/18/2007 7:55:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
4/5/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following sites where sediment control measures other than sedimentation ponds aze used were inspected. <br />Descri tion Condition <br /> <br />Rockdust Tank Good. <br />Fish Creek Dewaterin Site Good <br />Site of former CYCC Office <br />Buildin Good <br />Sandstones Power Substation Good <br />Railroad S ur Extension Area Good <br />Stoker Coal Loadout Good <br />Overland Belt West Good <br />Stora e and Trainin Area Good <br />7 North Esca e Shaft Not ins ected, snow on rimitive li ht du road. <br />EMD Ventilation Shaft Good <br />EMD Dewatering Treatment <br />Facili Authorized but not constructed. <br />Rockfall Hazazd Trenches Good <br />NMD Power Borehole and <br />Substation Good <br />NW Mains Ventilation Shaft Good <br />18-Ri ht Ventilation Shaft Good <br />Haul Road B Good <br /> <br />Discharge of mine water for a short period of time to Pond A was observed. <br />Measurements of water quality were taken on streams above and below the affected areas of the mine. See the <br />map attached for recorded parameters. <br />BACKFILL AND GRADING <br />Areas that require backfill and grading aze areas of long-term surface support facilities and underground <br />portals, shafts, and drill holes. No such areas aze under reclamation at this time. <br />PROCESSING WASTE <br />Coal mine waste was being stored and spread over waste disposal Area 2 and 2 '/z in compliance with the <br />PAP. <br />SUPPORT FACILITIES <br />All support facilities appeared to be in good repair. As mentioned under Hydrologic Balance above, all <br />impoundment structures were in good repair. The Fish Creek Tipple structures are in disuse and disrepair, but <br />aze programmed for demolition. <br />Sinking of the 6 North Mains Ventilation Shaft continues. Cuttings aze filling the pit for excavated materials. <br />C-1982-056. CC Inspection of 5 Apri12006 Page 5 of 7 pages. BGW <br />
The URL can be used to link to this page
Your browser does not support the video tag.