Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and [he facts or evidence supporting the enforcement action. <br />This aerial inspection was flown on May 18, 1999. The digital pictures were examined on June 1, <br />1999. No compliance problems were observed during the overflight. <br />Facilities <br />There were no compliance problems at the C Gulch ventilation shafr and substation #3 facilities azea <br />and at the Elk Creek main facilities area. <br />Roads <br />The road leading to the C Gulch ventilation area and the roads at the Elk Creek main facilities area <br />were in good shape. No obvious gullying was apparent at the emergency drill hole road in C Gulch. <br />The same was true for the Elk Creek drill hole road above and to the west of the Elk Creek drainage. <br />Hvdroloav <br />There was water in pond B and, apparently, in the pond at the C Gulch ventilation shafr azea. The <br />water levels appeared to be below discharge levels. No problems were evident with the pond <br />embankments. <br />Topsoil <br />There was no obvious gullying on the topsoil stockpile at the C Gulch ventilation shaft azea. <br />c:\ms97\sanbom\i nsp599b <br />