My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC00431
DRMS
>
Back File Migration
>
Inspection
>
INSPEC00431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:57 PM
Creation date
11/18/2007 7:55:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Inspection
Doc Date
1/31/2001
Doc Name
COAL INSPECTION REPORT
Inspection Date
1/9/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.- <br />UI. COMMENTS-- COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations <br />made doing the inspection. Comments also describe any enforcement actions taken <br />during the inspector and the facts or evidence supporting the enforcement action. <br />Notes: <br />The bridges are in disrepair. A reduced level of maintenance, sufficient for foot traffic, has <br />been approved. The plugged emergency spillway (one) from T-2 has been approved as <br />abandoned in place. <br />Items of interest from the previous inspections include: Signs and Markers Identification signs <br />need to be placed at the permit boundaries on USNF Road 306 (Middle Thompson Creek <br />Drainage). <br />This report is based on an aerial inspection of January 9, 2001. Mr. Harry Ranney, <br />Environmental Protecfion Speciai'rst (EPS) of the Divrsion, made the flight He took aerial <br />photographs doing the flight. This report is compiled by Byron G. Walker, EPS, based on an <br />oral debriefing of Mr. Harry Ranney and a review of photographs taken by Mr. Ranney. Mr. <br />Ranney stated that he saw no problems at the site. Photographs are on file at the Division, <br />and are numbered 25-01-01-09-1 (1 ), 25-01 -01-09-2 (2), and 25-01-01-09-3 (3). The <br />photographs have been transmitted electronically to the permittee. Comments are <br />necessarily limited to the scale and detail of the photographs. The Portal 3 area and the <br />Loadout Area were not covered by this inspection. <br />BOADS The access road into the Portal 1 facilities area appears in Photograph 2. It is snow <br />covered. It appears to be in good shape. <br />HYDROLOGIC BALANCE The long pond appears in Photographs 3 and 2. The inlet appears to <br />be functioning properly, as is the pond. It is not frozen over. Pond 1 and Pond 2 appear in <br />Photograph 2 All but the inleh of both ponds, and the surface spillway between the two, <br />appear to be frozen over. No problems are noted. Sedimentaton Pond P-9 appears in <br />Photograph 2 and a portion of the disposal area Sedimentation Pond appears in <br />Photograph 1. Both ponds contain snow, and appear to be in good repair. The riprap <br />drainage across the Portal 1 facilities area and the riprap west perimeter drain of the disposal <br />site appears in Photograph 1. Both appear to be in good repair. <br />PROCESS WASTE The waste disposal site appears in Photograph 1. It appears to be in good <br />shape. <br />Pps 3 d_~ Ppes. (dMs) 31 Jrrrn 2001 . (wrdlo) <br />
The URL can be used to link to this page
Your browser does not support the video tag.