Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE ~~ <br />Mine Site Evaluation <br />State Program NOV 2 4 2003 <br />1. Permittee/Person 9. Permit Numb r.. <br />~ 10. Pertnit Type <br />~ <br /> POWDERHORN COAL CO. ~ <br />n <br />C-041-81 ~ PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> POX 1430 05/21/2003 OBR <br />3. City 4. State ~~-dd -yyyy <br /> <br />CO 14. Permit Status 15. Site Status ] 6. Facility Ty e <br />PALISADE IN MC BE <br />5. Zip Code 6. Phone Number <br /> 17 OSM Office # 18. CCID # 19. Land Code <br />81526- I (970) 241-8118 <br />14 <br />~ SF <br />7. Operator Name, if Different than Permittee 0 <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> MESA <br />Mi <br />N <br />8 05-00281 CO <br />ne <br />ame <br />. <br />_ 23. AVS Permittee Entity ID Number 24. State Office <br />ROADSIDE PORTALS <br /> 056887 <br />25. Hours <br />1,0 a. Permit Review 2F. Sim ureBlo n~ <br />~~i ~•_.//~ ~~r 27. Revi~ew~in~~O,ff~icial: <br />~~ ~; A <br />IiC/"y~ <br /> <br />0 b. Site Visit Time <br />11 Signahrre: . <br />Signature: <br />. RANDY PAIR ID # 997 <br />Travel Time <br />c Review Date: l I / 19/ X003 <br />. <br />7.0 Printed Name: <br />mm - dd - yyyy <br />q.0 d. Report Writing Date: ~OF86I~093+ ~~' y 3 `2c'~~ Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />O~„.,Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surtace and underground coal mining activities have ceased and <br />operator has IeH the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(9) <br />ppermitted but not yet disturbed. A81..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimetl Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... gond Release: Reclamation completed and State Regulatory A63.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA....NOt Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP'.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC.. Temporary Cessation: The RA has granted performance bond(s), andlor reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131(6). FR.. Forfeited and Reclaimed: Forfeiture <br />i <br />C <br />l <br />rf <br />i <br />i <br />P1 <br />Ph <br />I <br />l <br />At l <br />t Ph <br />i <br />ng: <br />oa <br />su <br />ace m <br />n <br />ng <br />... <br />ase <br />e <br />ease: <br />eas <br />ase I bond release reclamat <br />on completed. <br />AP.. Active Coal Produc <br />activities are occurring. granted for entire permiHed area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant P2.. Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />NM..No Mining: The ermd Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 1 fi D...Ancillary (Haulroad, Conveyor, and/or Rails) H... Exploration Permits L... Remining site PPermitted <br />A... surtace E... Refuse andlor Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2l3 <br />C... Preparation Plant G... Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Aericulture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal aoeney enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeenev's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees includine those of affiliates) page 1 of -1~ <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-R88-REG-FAIR (1-888-i34-3247). ne.;.<a o«emn«a, i99a <br />