Laserfiche WebLink
III. COMMENTS-COMPLIANCE ~o~.+/~nel(r ~"~gr_O~,` <br />~6 ~/~ 2vNv d l ~ <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />REVEGETATION/RECLAMATION SUCCESS: The "old" revegetation on the refuse pile is in good <br />condition. The strip that was reseeded early last spring also appears to have grown nicely <br />over the past summer. The portion of the refuse pile that was just covered and reseeded is <br />growing nicely. The vegetation at the loadout appears to be in good condition (it looks like <br />that of the surrounding areas). <br />Miscellaneous: <br />- The wash plant has been demolished and most of the equipment from inside the wash <br />plant has been removed from the site. The operator was in the process of removing the <br />concrete pad at the time of the inspection. <br />- About half of the conveyor system and both stacking tubes have been removed. <br />- The operator has piled some demolition debris from the wash plant in the bone-yard area <br />by pond 2. <br />- The operator has started work on the permanent Magpie Creek Diversion. <br />IV. ENFORCEMENT ACTIONS <br />