My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC00175
DRMS
>
Back File Migration
>
Inspection
>
INSPEC00175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:43 PM
Creation date
11/18/2007 7:54:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
Inspection
Doc Date
12/10/1998
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
12/10/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATING FORM - REVEL ETATION wORk: coned <br />B. SHRUB fi TREE TRANSPLANTS <br />SPECIES NAME QUAN /ACRE ~ STOCK TYPE 6 SIZE <br />No cra nsplan[s required) ~ <br />C. SEEDBED PREPARATION <br />Tilling method q1: ch csel plowing <br />p2: <br />D. SEED APPLICATION <br />____________________ <br />Seedrng method: drill seeding <br />E. FERTILIZING <br />_______________ FERTILIZER / SOIL AMENDMENT <br />Materials used ql~ composted manure - pound •• <br />p2. <br />pl: <br />Application method ql: tract or drawn manure spreader •• <br />p2: <br />F. MULCHING <br />Filename M223-1 sheet 2 of 2 <br />MATERIAL. PLANTING ~ $/PERT ~ TOTAL ~ TOTAL <br />$/PLANT ~$/PLANT ~ PELLET ~ 5/PLANT ~ $/ACRE <br /> 50.00 <br />Total cransp lan[ cost /a cre~ $0.00 <br />$56.02 <br />Total cos[/acre. $56 .02 <br />To[a1 cos[/acre: $62 .54 <br />UNITS/ACRE ~ UNST ~ $/UNIT $/ACRE <br />2.000.00 ~ pound ~ 50.07 ~ $196 .00 <br />Total ma ce vials cos[/acre: 5196 .00 <br /> 561 .52 <br />Total app) icacron cost/acre: $61.52 <br /> MULCH / NETTING / OTHER MATERIALS ~ UNITS/ACRE UNIT ~ $/UNIT ~ $/ACRE <br /> <br />Mace vials used <br />pl: __••••_•_______•__•••••__-_-- ------------===== <br />straw (delivered) - bale • ~ =====--====••__==•••=•___-=---- <br />65.00 ~ bale ~ 57.90 ~ e--•==•• <br />$257. ___ <br />76 <br /> p2: ~ ~ ~ ~ <br /> p3: <br /> p4: <br /> Total materials cost/acre: 5253. 76 <br />Application method ql: power mulcher Ihay spr. 1" deep) •• 562 92 <br /> p2: crimping (with Crac[or) $43. 00 <br /> q1 <br />__________________________________________________ <br />_________________________________ <br /> Total application cos[/acre: $105. 42 <br />G. SOB COST _ ________ ___ <br />total area to be seeded: 6.50 acres. Total $/acre $727.97 Total In is ial Job Cost= <br />$4,7]1. <br />8] <br />Estcmated failure rate: 0.008 of area. Total $/acres <br />$0.00 Total Reseeding Cos [s = <br />$0 <br />00 <br /> Reseeding cost ate ms: None GRAND TOTAL JOE COST = $9,771 .83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.