<br />• (Page 2) • <br />MINE ID # OR PROSPECTING ID # M-82-090 <br />INSPECTION DATE 10-7-98 INSPECTOR'S INITIALS SSS <br />This was a partial inspectior.~ of the Camp Bird Mine, conducted to evaluate reclamation <br />measures that have taken place on site. Remaining tasks to be conducted, to reclaim the site <br />as per the approved reclamation plan, were also evaluated. <br />Structures currently on site that need to be removed include the storage building north of <br />the mill, the scale house, ecnd the snow shed/machine shop at the portal. All three <br />structures are wood framed with steel sheet exteriors. The storage building has been sold <br />and is partially dismantled. The purchaser plans on completing removal of the structure in <br />spring of 1999. <br />Concrete foundations, for nearly every building that was on site, still require demolition <br />and disposal, or burying. These foundations include: <br />Scale house - approx. 24 ft. r: 30 ft. pad - on grade. <br />North mill storage bldg. - approx. 36 ft. x 62 ft. pad - 3.5 ft. stem wall. <br />Northwest mill storage bldg. - approx. 30 ft. x 60 ft. pad - on grade. <br />Mill bldg. - approx. 60 ft. x 140 ft. constructed on several levels - concrete generally 2 <br />ft. thick, probably reinforced - 8 ft. stem walls. <br />Crusher and ore bin foundation - approx. 35 ft. x 50 ft. - majority is on or below grade. <br />Oil storage bldg. - approx. 8 in. thick pad 40 ft. x 22 ft - approx. 3 ft. above grade on <br />mound constructed of tailings confined by timbers. <br />Shop bldg. - approx. 110 ft. x 50 ft. pad - approx. 3 ft. stem walls. <br />Small shop southeast of main [:hop - approx. 24 ft. x 35 ft. pad - on grade. <br />It is unknown if the on-site power transformers will remain since no powerlines are connected <br />to the historic buildings. One: of the three transformers does not have a PCB concentration <br />certification sticker on it. '[f they are to be removed, costs for proper disposal of this <br />transformer, assuming PCB contamination, should be considered. <br />No evidence of increased tailing erosion was noted during this inspection. <br />The portal is partially collapsed, but the mine can be accessed through the portal. The <br />water discharging from the portal is 1.5 to 2 ft. deep, leaving approximately 2.5 to 3 ft. <br />of opening above water level. <br />Buildings where the superstructure have been removed include the mill, crusher, ore bin, oil <br />storage, main shop, small shop, snow shed from portal area to ore bin, and the storage bldg. <br />northwest of the mill. <br />The mine discharge pipe has been cut at the Imogene Creek crossing and now discharges <br />directly to that creek. The iaediment pond is still holding water, but is not discharging. <br />Portions of the discharge pipe, no longer used and exposed on the surface, will need to be <br />removed. Estimate 150 to 200 ft. of pipe plus steel support structure at Imogene Creek. <br />