My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-02-18_REVISION - M1980244 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2026-02-18_REVISION - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2026 4:01:04 PM
Creation date
2/20/2026 3:57:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/18/2026
Doc Name Note
Appendix I
Doc Name
6. Appendix I
From
CC&V
To
DRMS
Type & Sequence
TR156
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2 Phase 3Stage B.2 Record of ConstructionGeomembrane Fusion Trial Seam SummaryStrength (ppi)Mode1Strength (ppi)Mode1Strength (ppi)Mode1Machine SettingsTest ResultsQA MonitorRemarks2,3,4Temp.(°F)Speed (ft/min)Inside Peel(Min. = 100 ppi)Outside Peel(Min. = 100 ppi)Shear(Minimum = 120 ppi)Pass/FailDateSample NumberTimeMachine NumberOperatorAmbient Air Temp.(°F)145 SE1 140 SE1141 SE1 147 SE1155 SE1 176 SE1158 SE1 167 SE1152 SE1 163 SE1164 SE1 155 SE1159 SE1 170 SE1165 SE1 140 SE1158 SE1 173 SE1157 SE1 159 SE1134 SE1 163 SE1139 SE1 158 SE1163 SE1 163 SE1160 SE1 163 SE1170 SE1 167 SE1157 SE1 164 SE1158 SE1 154 SE1162 SE1 155 SE1152 SE1 155 SE1174 SE1 158 SE1181 SE1 159 SE1151 SE1 157 SE1116 SE1 137 SE1118 SE1 134 SE1130 SE1 127 SE1119 SE1 142 SE1167 SE1 174 SE1162 SE1 162 SE1155 SE1 172 SE1154 SE1 171 SE1160 SE1 171 SE1167 SE1 177 SE1SS840 15.0 195 BRK P OABRK P PC SS8/19/2025 TF-165 6:55 AM 1018 SR 52SS8/16/2025 TF-164 7:03 AM 1018 SR 52 840 15.0 182840 15.0 197 BRK P PCBRK P OA TT8/16/2025 TF-163 6:56 AM 615 JS 52ST8/14/2025 TF-162 2:00 PM 615 JS 76 840 15.0 143840 15.0 151 BRK P OABRK P OA ST8/14/2025 TF-161 1:55 PM 615 JS 76SS8/14/2025 TF-160 7:10 AM 1018 SL 54 840 15.0 176840 15.0 193 BRK P OABRK P OA ST8/14/2025 TF-159 7:10 AM 1018 SL 54SS8/14/2025 TF-158 7:01 AM 615 JS 54 840 15.0 180840 15.0 192 BRK P OABRK P OA TT8/14/2025 TF-157 6:56 AM 615 JS 54ST8/13/2025 TF-156 12:56 PM 615 JS 75 840 15.0 170840 15.0 154 BRK P OABRK P OA SS8/13/2025 TF-155 12:50 PM 615 JS 75TT8/13/2025 TF-154 7:10 AM 1018 SR 50 840 15.0 194840 15.0 204 BRK P OABRK P OA ST8/13/2025 TF-153 7:05 AM 1018 SR 50ST8/13/2025 TF-152 7:04 AM 1018 SR 50 840 15.0 207840 15.0 205 BRK P OABRK P OA SS8/13/2025 TF-151 7:03 AM 615 JS 508/13/2025 TF-150 7:00 AM 615 JS 50 840 15.0 186Page 3 of 4 1See Figure 3 for Break Modes2TT - Textured to Textured Weld 3SS - Smooth to Smooth Weld4 ST-Smooth to Textured Weld
The URL can be used to link to this page
Your browser does not support the video tag.