Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Valley Leach Facility 2 <br />Phase 3 Stage B.2 Record of Construction <br />Photograph Log <br />PHOTO <br />NUMBER PHOTOGRAPH DESCRIPTION DATE TAKEN PAGE <br />1 Soil Liner Fill placement progress above 10,325' elevation. July 9, 2025 1 <br />2 Soil Liner Fill grading and compaction over temorary anchor <br />trench.July 29th, 2025 1 <br />3 Soil Liner Fill rough grading above 10,325' elevation. August 5th, 2025 2 <br />4 Soil Liner Fill nuclear density testing above 10,325' elevation August 8th, 2025 2 <br />5 Geomembrane fusion seam pressure testing. August 8th, 2025 3 <br />6 Geomembrane panel deployment. August 9th, 2025 3 <br />7 Geomembrane fusion seam pressure testing. August 15th,2025 4 <br />8 Geomembrane extrusion seaming over temporary anchor <br />trench.August 18th, 2025 4 <br />9 Geomembrane fusion seaming of panels. August 21st, 2025 5 <br />10 Geomembrane extrusion weld vacuum testing. August 25th, 2025 5 <br />11 Drain Cover Fill placement and 12" CPeP perimeter pipe. September 9th,2025 6 <br />12 Drain Cover Fill placement. September 23rd, 2025 6 <br />13 Drain Cover Fill placement and 12" CPeP perimeter pipe. September 25th, 2025 7 <br />14 Drain Cover Fill placement and 12" CPeP perimeter pipe. October 8th, 2025 7 <br />Page 1 of 1