Laserfiche WebLink
SSR Cripple Creek & Victor Gold Mine VLF2 Phase 3 Stage B NewFields Job No. 475.0106.072 Week Ending Friday, May 9, 2025 <br />Page 2 <br />1.0 CONTRACTOR OPERATIONS <br /> Earthworks <br />1.1.1 Subgrade <br />Kelley Trucking (KTI) used a John Deere 950k and D8 LGP dozer to prepare subgrade on the north <br />and central side of Stage B between elevations 10,325’ and 10,450’. <br />KTI continued to grade the northern abandoned Schist Island haul road to the Stage A tie-in. A <br />John Deere 950k, D8 LGP dozer, and 349 excavator cut material to grade along the tie-in. A 980 <br />loader hauled the material to outside the northern limits of Stage B for future use. <br />1.1.2 Structural Fill <br />No structural fill was placed during this period. <br />1.1.3 Soil Liner Fill <br />No soil liner fill was placed during this period. <br /> Geosynthetics <br />No geosynthetics were installed during this period. <br />2.0 MEETINGS AND COMMUNICATIONS <br />NewFields personnel conducted daily safety meetings at 7:00am. <br />NewFields personnel attending the weekly owners meeting with JHL, KTI and CC&V. Topics <br />of discussion included inclement weather and the schedule for liner placement to begin. <br />Spoke with JHL and KTI superintendents (James Land; Cody Jensen) about scheduling for the <br />inclement weather during the week. Ultimately JHL and KTI made the determination to cancel <br />the week’s work on the afternoon of Tuesday, May 6th. <br />3.0 MISCELLANEOUS, ISSUES, AND CONCERNS <br />Heavy precipitation and eventual snow accumulation slowed and eventually halted all <br />construction on Stage B on Wednesday, May 7th.