Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> yf <br /> 1 1 Cropland(CR) I I Pastureland(PL) JD General Agriculture(GA) <br /> 1' Rangeland(RL) 1] Forestry(FR) Wildlife Habitat(WL) <br /> ' . Residential(RS) n Recreation(RC) Industrial/Commercial(IC) <br /> E• t Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> 0 Cropland(CR) ` Pastureland(PL) General Agriculture(GA) <br /> 0 E <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) n Recreation(RC) II Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Dry mining with dozers, loaders, scrapers, and excavators. <br /> 15. On Site Processing: 119 Crushing/Screening <br /> 13.I Briefly explain mining method(e.g.truck/shovel): <br /> Raw material moved with haul trucks and conveyors to wash/screen/crushing processing plant(s). <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />