Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br /> • Annual Reclamation Report for Calendar Year — 2025 <br /> Deserado Mine C-1981-018 p Blue Mountain Energy, Inc. p <br /> Mine Name Permit Number Permittee <br /> 3607 County Road 65 Rangely, CO 81648 <br /> Address <br /> This report,required by Rule 2.04.13,is due by February 15 of each year,or other date,as agreed upon by the Division. It should include text, <br /> discussion,and maps,at a minimum,in addition to any other reclamation monitoring data as required by the approved permit. The location of the <br /> acreage reported under each land status category and year of seeding(if applicable)should be clearly identified on a map included with the report. <br /> Last Year's Cumulative Total This Calendar Year <br /> Land Category Cumulative Total <br /> (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> Acreage <br /> in in AcAreas' <br /> N/A N/A N/A N/A <br /> Mining Areas <br /> Last Year's Cumulative Total This Calendar Year <br /> Land Category 's ARR) Cumulative Total <br /> (from last year's Acres Added(+) Acres Subtracted(-) <br /> Acres Disturbed' 642.9581 3.37 0 = 646.3281 <br /> Acres Backed and <br /> Gradeded 185.55 1 .74 0 = 187.29 <br /> Acres Topsoiled 185.55 1.74 0 = 187.29 <br /> Acrea a in Lon -term Last Year's Cumulative This Calendar Year <br /> g g Total Cumulative Total <br /> Facilities' (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> S <br /> Non-Permanent 457.4081 3.73 1 .74 = 459.3981 <br /> Facilities <br /> Permanent Facilities 0 0 O 0 <br /> (permitted) <br /> Totals 457.4081 = 459.3981 <br /> Acres Seeded Last Year's Cumulative Total This Calendar Year <br /> Cumulative Total <br /> (permanent) (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> 9 Years and Less 34.26 1.74 4.93 = 31.07 <br /> 10 Years and Greater 151.29 4.93 0 = 156.22 <br /> Totals 185.55 = 187.29 <br /> Last Year's Cumulative Total This Calendar Year <br /> Bond Release Cumulative Total <br /> (from last year's ARR) Acres Added(+) Acres Subtracted(-) <br /> Phase I Released 0 0 0 = 0 <br /> Phase II Released 0 0 0 = 0 <br /> Phase Ill Released 0 0 0 = 0 <br /> 'Includes pits,topsoil stripped areas in advance of pits,and spoil not backfilled and graded <br /> 'Surface Mine Acres Disturbed=B&G+Long-Term Facilities+Active Mining Areas;Underground Mine Acres Disturbed=B&G+Long- <br /> Term Facilities;Separately-permitted Loadouts=B&G+Long-Term Facilities <br /> 'Includes haul,access and light-use roads,temporary dams and impoundments;permanent dams and impoundments;diversion and collector ditches, <br /> water and air monitoring sites;topsoil stockpiles;overburden stockpiles;repair, storage and construction areas; office area,repair shops, and <br /> 0 parking;coal stockpiles,loading,and processing areas;railroads;coal conveyors;refuse piles and coal mine waste impoundments;head-of-hollow <br /> fills;valley fills;ventilation shafts and entryways;and non-coal waste disposal area(garbage dumps and coal combustion by-products disposal <br /> areas). <br /> February 8,2019 <br />