Laserfiche WebLink
-4- <br /> 12. Primar future(Post-mining)land use(check one): <br /> Cropland(CR) _D Pastureland(PL) General Agriculture(GA) <br /> 2 Rangeland(RL) _D Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) _ElRecreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) J I Solid Waste Disposal(WD) <br /> 13. Primary present land use(check on <br /> EiCropland(CR) Pastureland(PL)-0111111 t""�"I General Agriculture(GA) <br /> �..-...l Rangeland(RL) Forestry(FR) El Wildlife Habitat(WL) <br /> BResidential(RS) Recreation(RC) EJ Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Material will be extracted using front end loaders. <br /> I S. On Site Processing: I I I Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Excavation will be performed by front end loaders which will remove and haul the raw resource. Screening of material may occur on site. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No designated chemicals or acid-producing materials will be used or stored within the permit area. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Not Applicable <br />