My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-21_REPORT - M1981043 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981043
>
2026-01-21_REPORT - M1981043 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 4:59:28 PM
Creation date
1/21/2026 4:55:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981043
IBM Index Class Name
Report
Doc Date
1/21/2026
Doc Name Note
CDPHE Stormwater Insp rpt
Doc Name
Annual Report Supplemental Information
From
CDOT
To
DRMS
Annual Report Year
2025
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAND AND GRAVEL REPORTING <br />(Required for the CDPHE Annual Report) Revised: 4118/18 <br />Facility Location: Certification No.: <br />North of Douglas Pass Pit COG502081 <br />Facility Location: Weather Conditions: <br />US 139 and Rope Canyon, Rio Blanco County DRY <br />Monitor's Name: Date of Inspection: <br />KIRK MARDESEN 07/07/2025 <br />COLORADO <br />Departmentopomtion <br />DBMS Permit No.: <br />M-81-043 <br />SWAP Administrator Name: <br />KIRK MARDESEN <br />CDOT Work Order Number: <br />Facility Inspection — Stormwater Only <br />This inspection is being performed in compliance with Part I.J. of the Stormwater Discharge Associated with Sand and Gravel Productions. If an <br />inspection(s) was not conducted in accordance with the required frequency, attach an explanation of why. <br />9. Was this the required one time annually the monitoring was conducted during a runoff event? C'es !0 No <br />2. Has the site created any process water (screen washing or transport slurry) or mine dewatering? OYeS O No <br />OActive Site: Require 4 inspections annually (Quarterly). Date that facility became active: U N KNOWN <br />0 Inactive and Unstaffed Site wl No Exposure: Require 2 inspections annually (Spring/Fall) and a signed Certification of No Exposure (Page 4 of 5) <br />signed. Inactive requires that no activities have taken place at the facility (except inspections) from the date of the last inspection listed here:� <br />VInactive and Unstaffed Site wl Exposure: Require 6 inspections annually (At least 20 days apart and no more than 2 months apart). Inactive requires <br />that no activities have taken place at the facility (except inspections) from the date of the last inspection listed here: <br />Control Measures at Time of <br />Inspection <br />Control <br />Used? <br />Measure <br />(t) <br />Maintenance <br />Required? <br />(2) <br />Additional Control <br />Measures Needed? <br />(3) <br />Comments — Include the location of <br />control measure and description of <br />corrective actions required. <br />Date of <br />Correction <br />(4) <br />Clean Water Diversion <br />Y <br />N <br />K <br />Y <br />N <br />Y <br />N <br />X <br />Sediment trap/basin <br />X <br />v <br />X <br />Perimeter control: Berm, Silt <br />fence, Erosion Lops, Bales <br />X <br />X <br />X <br />Check dam <br />X <br />X <br />Outlet protection <br />v <br />V <br />Vegetative Buffer <br />v <br />X <br />Landform <br />V <br />v <br />v <br />Seed/Mulch <br />V <br />v <br />X <br />_ ` <br />SeedlSoil Retention Blanket <br />Other: (examples -vehicle tracking <br />ad, fencin , etc. <br />� <br />X <br />(1) Indicate whether the control measure <br />(2) Indicate whether the control measure <br />stated in the permit, repairs or maintenance <br />(3) Indicate whether any new or different <br />the next anticipated storm, but in <br />(4) Enter the date that maintenance, <br />listed <br />requires <br />control <br />no case <br />repair, or <br />is in use at <br />any type <br />identified <br />measures <br />more than 60 <br />replacement <br />this facility. <br />of maintenance <br />shall be completed <br />are needed <br />calendar <br />of control <br />such <br />immediately. <br />on the <br />days after <br />measure <br />as repair or <br />project. As stated <br />the inspection. <br />is completed, <br />removal of accumulated <br />in the permit, <br />or that an new <br />sediment; or if the control measure has <br />revised control measures shall be implemented <br />type of control measure is installed. <br />failed. As <br />before <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.