My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-01-05_REPORT - M1999042
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999042
>
2026-01-05_REPORT - M1999042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 4:36:53 PM
Creation date
1/6/2026 4:33:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999042
IBM Index Class Name
Report
Doc Date
1/5/2026
Doc Name Note
Annual Report
Doc Name
Annual Fee/Report/Map
From
Avalanche Creek Marble & Alabaster LLC
To
DRMS
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Report Questions <br />14. Is weed control being conducted in accordance with an approved Weed Control Plan?* <br />15. Is adequate topsoil reserved for reclamation, based on your approved permit?* <br />16. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)?* <br />17. If mining has exposed groundwater, is the site in compliance with the approved mining plan and <br />Office of the State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)?* <br />18. Are all hazardous materials stored within approved spill containment structures?* <br />19. Is your financial warranty value sufficient to cover the cost to complete reclamation?* <br />20. Is your basis for legal right to enter still valid? * <br />21. Does your permit require you to submit monitoring information annually?* <br />22. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for <br />the Extraction of Construction Materials (C.R.S.34-32-116 or 34-32.5-116), attach a map to this report <br />that accurately depicts the permit boundary, current affected area boundary and location of the <br />acreages specified in items 8-12 and 15.* <br />23. If you have supplemental information you would like to provide, please upload it here. <br />24. Rule 5.7 requires submittal of final abandonment reports within 60 days for any drill hole(s) with <br />artesian flows and no later than 12 months for all other completed drill holes. If drill holes are a <br />component of your exploration/prospecting activities, have they been properly abandoned? <br />Previous Proceed <br />If “YES”, indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />Yes No N/A <br />If “NO”, please explain <br />Yes No N/A <br />If “NO”, please explain <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No N/A <br />Yes No <br />Yes No N/A <br />Only PDF formatted files can be uploaded. <br />site map Pages from Final White Banks PLO 2021.pdf 422.57KB <br />Only PDF formatted files can be uploaded. <br />Yes No NA
The URL can be used to link to this page
Your browser does not support the video tag.