Laserfiche WebLink
SSR Mining CC&V <br />VLF 2 Phase 3B/C Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 4 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br />6. APPROVALS: Completed each week by assigned representative or designee. <br /> <br />Role Name Signature <br /> <br />Project Engineer <br /> <br />Daniel Egley <br /> <br /> <br /> <br />OR Project Engineer Designee: Zac Cook <br /> <br /> <br /> <br /> <br />Tech Services/ CQA Monitor <br />Manager <br /> <br />Kathy Steele <br /> <br /> <br /> <br /> <br />OR Tech Services Designee: Ernest Amakye <br /> <br /> <br /> <br />S&ER Manager <br /> <br /> <br /> Antonio Matarrese <br /> <br /> <br /> <br /> <br />OR S&ER Designee: Brian Doering <br /> <br /> <br /> <br />Mine Manager <br /> <br /> <br /> Derrick Thuringer <br /> <br /> <br /> <br /> OR Mine Ops Designee: Nicholas Schwind <br /> <br /> <br />Docusign Envelope ID: 204C7568-04A0-4E05-8DCE-3F8361829E6C