Laserfiche WebLink
SSR Mining CC&V <br />VLF 2 Phase 3B/C Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 1 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br />1. SHIFT REPORTS: <br /> <br />Report Period: <br />Friday-Thursday <br />Ambient Temperature Weather Conditions <br />High Low Precipitation <br />Date: <br />11/07/25 – 11/13/25 53.1 14.5 0 inches precipitation <br />measured at CC&V <br /> <br /> <br />Observations & Comments <br />CC&V started and completed compacting 9,975 and began compacting <br />the 9,985 low compaction lift. Material was sourced from Globe Hill. <br /> <br />2. AREA OF BACKFILL: The light blue area highlights the 9,975 & the dark blue outline highlights 9,985 low compaction lift. <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: CC8735BB-B75B-4B24-BC49-460AC93902C7