My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-12-22_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-12-22_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2025 3:54:53 PM
Creation date
12/22/2025 3:53:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
12/22/2025
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR152
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shipping Container (1) <br />(20'Lx8'Wx6'H)960.0 2.42$ 2,324.35$ <br />Generators (2) <br />15kW (6'Lx2.6'Wx3.5'H) <br />80kW (11.6'Lx3.8'Wx7'H) <br />363.2 2.42$ 879.28$ <br />Propane Tanks (3) <br />(9.9'Lx3.25'D)246.4 2.42$ 596.55$ <br />6,000 Gallon Backwash Tank (1) <br />(16'Hx10.5'D)1385.4 2.42$ 3,354.43$ <br />MMF Vessels (2) <br />(7'Hx5.5'D)222.7 2.42$ 539.10$ <br />Ozone Shed (1) <br />(8'Wx10'Lx8'H)640.0 2.42$ 1,549.57$ <br />4,500 Gallon Ozone Contact Tank (2) <br />(13'Hx8'D)653.5 2.42$ 1,582.13$ <br />Pipe Removal (L.F.)2"-6" HDPE Piping 1800.0 4.56$ 8,208.00$ <br />Waste Disposal - Solid Geotube Transport & Disposal 12.0 1,417.59$ 17,011.07$ <br />36,044.49$ <br />10,272.68$ <br />46,317.16$ Total: <br />DRMS Indirect Cost (28.5%) <br />Table 1: TR-152 AR #1 Carlton Tunnel Pilot Plant <br />Task Description Unit Cost Total CostQuantity <br />Subtotal <br />Equipment Demolition (C.F.)
The URL can be used to link to this page
Your browser does not support the video tag.