My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-09_PERMIT FILE - M2025030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025030
>
2025-10-09_PERMIT FILE - M2025030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2025 3:54:53 PM
Creation date
12/22/2025 3:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025030
IBM Index Class Name
Permit File
Doc Date
10/9/2025
Doc Name
Adequacy Review Response
From
Mile Hi Rock and Minerals Society
To
DRMS
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D - Reclamation Plan <br />Rule 6.3.4 (Starts on Page 139 of the Rules) <br />The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br />used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br />lands. This plan must be correlated to Exhibit E - Map. <br />1)Primary future (Post-mining) land use (check one): <br /> Cropland (CR) Pastureland (PL) General Agriculture (GA) <br /> Rangeland (RL) Forestry (FR) Wildlife Habitat (WL) <br /> Residential (RS) Recreation (RC) Industrial/Commercial (IC) <br />2)Please provide a general description of how the mined area will be Reclaimed: <br />____________________________________________________________________________________ <br />____________________________________________________________________________________ <br />____________________________________________________________________________________ <br />____________________________________________________________________________________ <br />3)What will the final grade of the reclaimed slopes (Horizontal:Vertical): _______H:_________V <br />(Note: If the Applicant proposes slopes steeper than 3H: 1V (example 1H:1V, 2H: 1V, etc.), please <br />include a justification: <br />____________________________________________________________________________________ <br />____________________________________________________________________________________ <br />a.Please provide a general description of the backfilling and grading: <br />_________________________________________________________________________________ <br />_________________________________________________________________________________ <br />4)Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br />_____ 4-6 inches _____ 6-8 inches <br />_____ 8-10 inches _____ 10-12 inches <br />_____ Other: _________________________ <br />_____ N/A, explain: __________________________________________________________________ <br />__________________________________________________________________
The URL can be used to link to this page
Your browser does not support the video tag.