Laserfiche WebLink
16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br />cost the State of Colorado using an independent contractor to complete reclamation. The <br />Office adds up to an additional maximum eighteen and one half (18.5%) percent of that <br />total, which includes a private contract, typical overhead costs and profit. <br />Direct Cost: <br />i. Backfilling: (cubic yards) X $ (cost per yard) = Total $ . <br />ii.Grading: (cubic yards) X $ (cost per yard) = Total $ . <br />iii.Topsoil: (cubic yards) X $ (cost per yard) = Total $ . <br />iv.Seeding: (acres) X $ (cost per acre) = Total $ . <br />v.Mobilization: (Pieces of equipment) X $ (cost per equipment) = <br /> Total $ . <br /> Direct Cost Subtotal: $ . <br />Division’s total overhead cost: X 18.5% <br /> Division’s Total cost: $ . <br />Note: Based on the Division’s experience the required financial warranty is normally set at <br />approximately $2,500 per acre. Therefore, a typical 5 acre permit will have a total required financial <br />warranty in the amount of $12,500.